My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2901
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 2900 - 2999 (November 13, 1990 - July 23, 1991)
>
Resolution 2901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2016 1:18:09 PM
Creation date
11/16/2016 1:18:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� C�t of O�ONO <br /> : , �, <br /> ��'a,-� a "� <br /> ^x �r '.�..-' <br /> :'^ <br /> t�'�9aU+'�`'.� ,4` ;' <br /> ,�'�s:,"��'�"�>�� � <br /> � ��� ti RESOLUTION OF THE CITY COUNCiL <br /> ,, � <br /> '�_� <br /> `�"''� 2 9 O 1 <br /> oi NO. <br /> • - �I '`a <br /> 5. The City Counci 1 f inds that granting a conditiona 1 use <br /> permit to allow the proposed land alterations will not be <br /> detrimental to the health, safety or general welfare of the <br /> public, would not adversely affect light, air nor pose a <br /> fire hazard or other danger to neighboring properties , nor <br /> will its use depreciate surrounding property values and that <br /> the proposed leve 1 of use of the property wi 11 be in keeping <br /> with the intent and objectives of the Zoning Code and <br /> Comprehensive Plan of the City. <br /> CONCLDSIONS, ORDER AND CONDITIONS <br /> Based upon one or more of the above findings, the Orono <br /> City Council hereby grants a conditional use permit pursuant to <br /> Municipal Zoning Code Section 10.03 , Subdivision 19 to permit <br /> grading and filling work in excess of 100 cubic yards and outside <br /> the scope of the normal building permit grading approval, subject <br /> to the following conditions: <br /> l. Absolutely no grading work will be allowed in the 0-75' <br /> lakeshore setback zvne. <br /> 2. Grading work shall adhere to the approved plan attached <br /> hereto as Exhibit A, with the following stipulations: <br /> A) The swales around the mound system must carry a 2$ <br /> or steeper grade to minimize the possibility of <br /> standing water adjacent to the mound. <br /> B ) The swale along the west lot line shall be <br /> constructed to keep the majority of the drainage on the <br /> site. <br /> 3. Upon completion of the grading, applicant or applicant's <br /> contractor shall provide appropriate erosion control <br /> measures as may be required by the City Inspector, to be <br /> maintained until such time that the graded area is <br /> revegetated. <br /> 4. Applicant or applicant's contractor shall obtain the <br /> necessary grading permit prior to commencement of this <br /> project. <br /> 5. Violation of or non-compliance with any of the terms and <br /> conditions of this resolution shall constitute a violation <br /> of the Zoning Code, shall automatically terminate any <br /> authority granted herein, and shall be punishable as a <br /> misdemeanor. <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.