Laserfiche WebLink
contact information, project phasing, schedules, along with the timing, installation and <br /> , maintenance of erosion and sediment control measures and specifications necessary to carry <br /> out the project. <br /> (3) NPDES permit documentation: The property owner owner's agent shall apply for and be issued a <br /> National Pollution Discharge Elimination System (NPDES) general stormwater permit from the <br /> Minnesota Pollution Control Agency (MPCA); and shall submit to the city a copy of the MPCA <br /> Certificate of Permit Coverage. <br /> I have a copy of the wetland buffer plan for the subdivision. It shows the grading but does not include all the <br /> grading specifications. Plus I'm not sure if it is what the MCWD approved. It would probably be for the best if <br /> you obtained a copy from the engineer — Mike Brandvold at Anderson Engineering 763-412-4000 (13605 1St <br /> Avenue North, Plymouth). <br /> What may complicate matters is that the grading is for the MCWD. They seem to require a 35 foot buffer. I <br /> don't know what they want/don't want in the buffer. The City requires a 25 foot buffer. We don't want horses in <br /> the buffer; that's the reason the horse fence has to be moved. <br /> I'll put the plan up front with your name on it. It will be in the "general paperwork to be picked up" drawer if I'm <br /> not around. <br /> Evelyn Turner <br /> z <br />