My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-1997 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
1990-1999
>
1997
>
01-13-1997 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2012 3:01:50 PM
Creation date
9/27/2012 3:01:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON JANUARY 13, 1997 <br />• ( #6 - Proposed North Long Lake Sewer Projects - Continued) <br />Cook reviewed the costs of the project. The lateral facilities including street repair are <br />estimated at $616,114, and the trunk facilities at $414,157 to include the force main. <br />With 55 units in the area, this would result in an $18,730 charge per unit. The Dakota <br />Avenue surfacing at an estimated $18,284 would result in a $1930 per unit charge for <br />those along Dakota Avenue, or an additional $350 if all 55 units were factored in. <br />Goetten asked if the costs were figured on last years' dollars, what increase might be <br />shown for the project this year. Cook was of the opinion that the cost was within the <br />estimate at +/ -5 %. <br />The meeting was opened to public comments. <br />John Gawron, 920 Dakota Avenue, asked if the City would take over maintenance <br />(repair, plowing) of Dakota Avenue once it is resurfaced. Dakota Avenue is a private <br />road and currently gravel. Kelley was of the opinion that the City maintains roads with <br />sewer but said it was in question. Jabbour noted the need to distinguish between rural <br />and urban roadways which would affect the answer to this question. Moorse reported <br />the City was now beginning to bring sewer to rural areas. No change to the policy <br />regarding maintenance has occurred but could be considered by the Council. Goetten <br />informed Gawron that the Council would need more background information before any <br />• determination could be made. <br />Tom Steinke, 910 Dakota Avenue, asked if manhole covers would be required once the <br />sewer is in. Cook reported that manholes would be installed. <br />Mr. Gawron informed the Council that he did not wish to pay $2,000 towards <br />blacktopping Dakota Avenue. Mrs. Gawron connnented that the road was not properly <br />bedded. Cook informed them that the road's gravel base would be put back in proper <br />form. <br />Jabbour asked if it is the recommendation that Dakota Avenue become blacktop. Cook <br />reported that it was, however, the ultimate decision to pay for the blacktop rests with the <br />property owners. He noted that the cost of maintenance is lower with a blacktopped <br />road. <br />Goetten asked what was involved in resurfacing a road. Cook said the road is lowered <br />about 6 ". Below that, the road is cut down another 15 -1/2" for the crushed rock base. <br />3" of bituminous is laid over the base resulting in a 7 -ton road capacity. Cook reported <br />that a gravel road cannot handle 7 -tons which is desired for the long term. The life of a <br />bituminous road is 20 years. <br />Is <br />
The URL can be used to link to this page
Your browser does not support the video tag.