My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00413 - new structure
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
1340 Fox Street - 02-117-23-31-0056
>
Permits/Inspections
>
2015-00413 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:08:53 PM
Creation date
10/5/2016 10:32:35 AM
Metadata
Fields
Template:
x Address Old
House Number
1340
Street Name
Fox
Street Type
Street
Address
1340 Fox St
Document Type
Permits/Inspections
PIN
0211723310056
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Technical�vatua4ion R��art(�'ER) <br /> 9.2.91.3. When, in addition to the requirements of lli.._'S�,c�tio����;;�.i Y._,i, an approved method of protecting <br /> Thermasheath�-3, Thermasheath�-XP, TSX-860Q, 'fSX-8510,TSX-8520 and the structure from <br /> subterranean termite damage is used. <br /> 5.2.12. These products are manufactured by Rmax 4perating, LLC in Dallas, TX; Fernley, iVV; and Greer, SC, <br /> under a quality control program with qualiYy control inspections in accordance with tClC;.;seciion rt_i�9.2 <br /> and if1C- --::_r,(i��:;_i.i�,;;..y and.�.iq _. : --- <br /> 9.3. Design <br /> 9.3.1. Building Designer Responsibility <br /> 9.3.1.1. Unless the AHJ allows otherwise, the Construction Documents shall be prepared by a Building <br /> Designer(e.g., Owner, Registered Design Professional,etc.) for the Building and shall be in <br /> accordance with I!<C;�:_.r.fi�,i ;i:i 0Ea and if 3C Sc�ctic>t7 i 07. <br /> 9.3.1.2.The Construction Documents shall be accurate and reliable and shall provide the location, direction <br /> and magnitude of all applied loads and shall be in accordance with l�1C S�ction 3C'i_and IS(;Secqio;� <br /> 1603. <br /> 9.3.2. Construction Documents <br /> 9.3.2.1. Construction Documents shall be submitted to the Building Official for approval and shall contain the <br /> plans, specifications and details needed for the Building Official to approve such documents. <br /> 9.4. Responsibifities <br /> 9.4.1. The information contained herein is a praduct, engineering or building code compliance research report <br /> performed in accordance with the referenced building codes,testing and/or analysis through the use of <br /> accepted engineering procedures, experience and good technical judgment. <br /> 9.4.2. Product, design and code compliance quality control are the responsibility of the referenced company. <br /> Consult the referenced company for the proper detailing and application for the intended purpose. <br /> Consult your local jurisdiction or design professional to assure compliance with the local building code. <br /> 9.4.3. DrJ research reports provide an assessment of only those attributes specifically addressed in the <br /> Products Evaluated or Code Compliance Process Evaluated section. <br /> 9.4.4. The engineering evaluation was perfonned on the dates provided in this TER, within DrJ's professional <br /> scope of work. <br /> 9.4.5. fihe�ictua�de�ign, suitability and us�of this research report for any pa��iicular building is the responsibility <br /> of the Owner, the Owner's authorized agent or the Buflding Designer. <br /> 10. Idsntlficatfon: <br /> 10.1. Each FPIS panel described in this TER is identified by a label on the board or packaging material bearing the � <br /> manufacturer's name, product name, label of the third-party inspection agency,and other information to <br /> confirm code compliance. <br /> 10.2. Additiona(technical information can be found at Ftr�7ax.c�r». <br /> 11. Review Schedule: <br /> 11.1. This TER is subject to periodic review and revision. For the most recent versian of this report, visit <br /> drien_gin�erina.oro. <br /> 11.2. For information on the current status of th+s report, contact GrJ�nc�i���crinc,. <br /> Scope of Responsibifity!Work,Operations Policies,and Legal Responsibllities <br /> � • N_ission and Sco a�e of(�e�onsibil� <br /> • Product Evaluation Oparations Goncepl5 21�d Pulicies <br /> - ' 0 1;ERs�,re Comparahle toycun�atible��ith,and Eguivali�np_lo thc,F�umose of an_ICC,.l:S ESf�_ <br /> "" fAP�1G[_F'.,Inte��tek IRFtiF�rchitcClUl�I 12StIf1U.�:L�h �CC. <br /> o leq_al A�ects of Product An�.roval <br /> TER No. 1309-03 � � Page 11 of 11 <br /> Rmax Thermasheath -3, Thermasheath -XP, <br /> TSX-8500, TSX-8510 &TSX-8520 <br />
The URL can be used to link to this page
Your browser does not support the video tag.