My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-2016 Council Minutes
Orono
>
City Council
>
2016
>
08-08-2016 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 4:07:12 PM
Creation date
9/29/2016 4:06:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, August 8, 2016 <br />7:00 o'clock p.m. <br />6. FOX STREET FEASIBILITY REPORT (continued) <br />Walsh moved, Levang seconded, to accept the Fox Street feasibility report. VOTE: Ayes 5, Nays 0. <br />*7. WATERTOWN ROAD AND STUBBS BAY ROAD REHABILITATION — PAY <br />REQLTST NO.2 <br />Levang moved, Walsh seconded, to approve Pay Request No. 2 to Valley Paving in the amount of <br />$100,045.88 for the Watertown Road Phase 2 rehabilitation project. VOTE: Ayes 5, Nays 0. <br />*8. 2016 SANITARY SEWER REHABILITATION PROJECT AWARD <br />Levang moved, Walsh seconded, to award the sanitary sewer improvements contract to Insituform <br />for $215,177.90 and approve the Bolton & Menk construction management proposal for a fee not to <br />exceed $17,900.00. VOTE: Ayes 5, Nays 0. <br />PUBLIC WORKSICITY ENGINEER REPORT, CONTINUED <br />Edwards reported on the following work completed by the Public Works Department and the City's <br />contractors: <br />• Final work is being completed by the contractor on Watertown Road <br />• Utility work and paving is currently underway on Watertown Road <br />• Repairs on Loma Linda have been completed <br />• Sewer cleaning throughout the City is underway <br />• Right of way mowing is being done <br />• Tree removal on Brown Road was completed <br />• Phase H of the Watertown Road project is currently underway <br />• Culvert replacement was performed on Cherry Avenue <br />• Curb replacement was performed on Bohns Point Lane <br />• Erosion repair was completed on Loma Linda <br />• 2016 sewer cleaning is underway <br />• Well construction is underway <br />• GIS mapping of Saga Hills has been completed <br />• French Creek signage has been installed <br />Edwards noted one of the City's maintenance workers has resigned and that he is currently in the process <br />of filling that position. <br />PUBLIC SAFETY REPORT <br />None <br />PLANNING DEPARTMENT REPORT — Planning Commission Representative Bruce Lemke <br />Page 5 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.