My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-1988 Council Minutes
Orono
>
City Council
>
1988
>
10-24-1988 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2012 4:42:36 PM
Creation date
8/27/2012 4:42:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF REGULAR ORONO COUNCIL MEETING OCTOBER 24,1988 <br />ZONING FILE #1339 -LEE CONTINUED • <br />said that Staff's position was based upon previous conditions of <br />approvalmade in the past by the Council. <br />Mr. Lee said that Mr. Robin was scheduled to arrive shortly. <br />He explained that he had tried on his own to stabilize the bank <br />after it had washed away. Callahan commented that he had heard <br />Mr. Robin's presentation at the Planning Commission meeting. He <br />suggested that the Council try to be consistent in the policies <br />they set forth in these cases. He was not certain whether the 8' <br />steps should be allowed to remain, simply because they are <br />already there. Mr. Lee stated that the steps stabilize the <br />entire bank. Mabusth concurred that the steps, at this point, <br />were providing stabilization for the bank. Callahan and Goetten <br />believed that the option for restoration of the bank that was <br />most in line with the City's policies should be chosen. <br />Councilmember Goetten expressed the difficulty in dealing <br />with after - the -fact requests, especially in this type of <br />application where tearing down the retaining wall would worsen <br />the condition of the bank. She added that she did not like the <br />8' steps, but if that was the only way to stabilize the banks, <br />she would have to accept that. Mabusth stated that planters were <br />proposed to be placed within the 8' steps. <br />Mabusth asked Mr. Lee if he fully understood what the City • <br />staff was proposing. Mr. Lee answered in the affirmative. <br />Mabusth explained that timbers would be removed and the lower <br />wall would be exposed. Instead of having the'upper two tiers of <br />retaining wall, there would be an earthen slope and plantings. <br />Councilmember Callahan observed that there was a <br />concentration of after - the -fact variances that occured on Casco <br />Point, Baldur Park Road and Fagerness Point Road. He said that <br />should Mr. Lee's variance request be approved, it would be likely <br />the Council would see yet another such incident. Mayor Grabek <br />expressed his desire 'to see Mr. Lee's bank restored to its <br />original condition. Mr. Lee interjected that the stone wall that <br />previously existed was "gross" in appearande. He added that <br />neighbors who had witnessed his construction of the new retaining <br />walls were very supportive. City Administrator Bernhardson asked <br />whether the walls could be extended and covered over, as opposed <br />to putting in the 4' planters? Mabusth replied that she would <br />need to get input from the City Engineer in that regard.' <br />Mr. Lee explained that he had designed and built the wall <br />himself. He was unaware of the fact that a retaining wall <br />required a building permit. He informed the Council that <br />eventually the wall would fade to a gray color and would not be <br />quite so noticable. He said that due to the support system of <br />the wall, he could not remove any timbers. Councilmember Nettles <br />asked why the 8' steps could not be narrowed to 41? Mr. Lee <br />explained that the 8' steps were stabilizers. City Administrator <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.