My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01020 (add./remod./repair)
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2480 Casco Point Road - 20-117-23-21-0037
>
Permits/Inspections
>
2016-01020 (add./remod./repair)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:52:20 PM
Creation date
9/14/2016 9:55:45 AM
Metadata
Fields
Template:
x Address Old
House Number
2480
Street Name
Casco Point
Street Type
Road
Address
2480 Casco Point Road
Document Type
Permits/Inspections
PIN
2011723210037
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Does this net approach appease the MCWD to avoid the erosion control permit requirement? <br /> Best, <br /> T.J. <br /> From:Terrence Chastan-Davis [mailto:tchastan-davis@minnehahacreek.or�] <br /> Sent:Tuesday,August 23, 2016 10:38 AM <br /> To:TJ Majdecki<TJ@murphycodesi�n.com> <br /> Cc: Pat Nelson <Pat@murphycodesi�n.com>; Raino Niemela <raino@jnbuilt.com>; Melanie Curtis <br /> <MCurtis@ci.orono.mn.us>; Christine Mattson (Orono) <cmattson@ci.orono.mn.us> <br /> Subject: RE: project at 2480 Casco Point Road, Orono <br /> Good morning Tj, <br /> Thank you for submitting the proposed project for our review. After reviewing the proposed project plans a MCWD <br /> permit will be required for erosion control.The area of disturbance will be greater than 5,000 square feet according to <br /> the submitted hardcover sheet. Attached you will find the required application materials. <br /> It also appears that the proposed retaining wall will be within the 100-year floodplain zone (931.5').The District's <br /> Shoreline and Streambank Stabilization and Floodplain Alteration rules will also be triggered. In order for the wall to be <br /> permitted under our Shoreline and Streambank Stabilization rule, an engineer will need to provide documentation that <br /> the wall will withstand expected ice,wave, and earth pressures according to section 10 of the rule (see attached). We <br /> would also like to know the dimensions of the proposed wall. <br /> The MCWD will need a calculation of the total floodplain fill and information on how this fill will be compensated within <br /> the 100-year floodplain per the Districts Floodplain Alteration rule (see attached).Since a Floodplain Alteration permit <br /> will be required, the project will also need to go through a two week public comment period to properties that are <br /> within 600 feet of the proposed project.The public notice period cannot start until we receive an updated site survey <br /> with the required documents. <br /> Please feel free to contact me if you have any questions or concerns. <br /> Thank you, <br /> Terrence Chastan-Davis <br /> District Representative <br /> Minnehaha Creek Watershed District <br /> 15320 Minnetonka Blvd <br /> Minnetonka, MN 55345 <br /> 952-641-4581 <br /> 1,_ - <br /> ;,,�; <br /> ��;< <br /> ��� <br /> MINI�fHAMA CR�EK <br /> YYAtER$itEb tIl$llZlCf <br /> From:TJ Majdecki [mailto:TJ@murphycodesi�n.com] <br /> Sent: Friday, August 19, 2016 10:22 AM <br /> To:Terrence Chastan-Davis<tchastan-davis@minnehahacreek.or�> <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.