Laserfiche WebLink
could and could not be done and what permits may be reqliired. You and <br /> Mr. Hafner accompanied my father and myself in tourinQ the entire «�ork <br /> site both north and south of the pavement and a large distance east and west <br /> along our property. During this time, we discussed each and every hole, <br /> burrow, depression, cave in, and other spot, we were interested in working <br /> on, as well as the entire shoreline north and south of the roadway. We also <br /> discussed our plans for working on the shoreline of our pond north of the <br /> road�vay. As there �vas some dif�erence of opinion on what you and Mr. <br /> Hafner ���ould each consider acceptable work under the cunent City of <br /> Orono land alteration permit number O l 0�0�, I asked the rivo of you to <br /> point out, hole by hole, what ���e could immediatel}� complete work on and <br /> which may need to wait for further clarification or possible additional <br /> permits to fill. You and Mr. Hafner then agreed to do so and did not grant <br /> permission on any hole where the rivo of you either did not agree, felt input <br /> was needed from the MDNR, or had anti� resen�ations about, as well as any <br /> that either of you definitel}� felt would not be permitted to be filled. I <br /> e�plained to both of y-oti at tlie time that I disagreed with some of the criteria <br /> and reasoning being used but that we were requesting and needed a detailed <br /> eYplaination of���hat you would each allow us to do that day. It was also <br /> agreed that we would not be required to remove fill already in place and <br /> would not be penalized or fined. As we were willing to stop work <br /> immediately when you requested and ���ere cooperating in determining ��-hat <br /> additional immediate work was appropriate that day. As �vell as our <br /> cooperation in seeking additional information regarding permit requirements <br /> if any. The conditions �ve were requested to fulfill in exchange were as <br /> follows. <br /> 1. All filling into the water, lakebed, floodplain, and any other site would <br /> stop immediately �vith the exception of the soil already on site being used to <br /> fill specific holes as agreed to by you and Mr. Hafner and for work along the <br /> pond shore north of the roadway. (At my direction, once the two of yoti had <br /> agreed on tliese specific areas, ��rork using the remaining soil on site was <br /> immediately begun �vhile in the presence and clear vision of both you and <br /> Mr. Hafner, as agreed, and neither of you objected to our filling these). <br /> 2. We would immediately use the silt fence, already on site arid on hand <br /> during the work, to pro��ide erosion control and pre�-ent rtinot�of the soil fill <br /> already in place near the lake. Specifically, �ve were to install silt fence to <br /> contain all fill placed that day�, south of the road«�ay, on the outer lal:e side, <br /> �vhere it was in contact ���ith the water. <br /> 3. We would begin discussions with the MCWD and MDNR and submit an <br /> application to them by Jan. 1, 1999. <br /> Q � <br />