My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-2011 Planning Commission Packet
Orono
>
Planning Commission
>
2011
>
07-18-2011 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 4:04:37 PM
Creation date
8/15/2012 4:04:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Developer shall obtain all necessary pemufs relating to the Public Improvements wiYh the <br /> asszstance and cooperation of the Crty. <br /> 11. DEWATERING. Due to the variable nature of groundwater levels and <br /> stormwater flows, it will be the Developer's and the Developer's cantractors and subcontractors <br /> responsibility to satisfy thems�lves with regard to the elevafaon of groundwater in the area and <br /> the level of effort needed to perform dewatering and storm flow routing operations. All <br /> dewatering shall be in accordance with all applicable county, state, and federal xules and <br /> regulations. <br /> 12. LICENSE. The Developer hereby grants fihe City, its agents, employees, offiicers <br /> and coniractors a Iicense to enter upon the areas of the Development Property reasonably <br /> necessary to perform all work and inspections deemed apprapriate by �lie City in conjunction <br /> with Plat development and the installation of Public Tmprovements by fi�ie Developer. The City <br /> shall hold the Developer (and its successors and assigns) harmless from any cause of action or <br /> claaims as a result of the negligence or willful misconduct of the City, its agents, employees, <br /> . officers arid contractors on entering the platted property and its performance of all of its work <br /> and inspections. . <br /> 13. EROSI4N CONTROL. Prior to initiating site grading, the Storm Water <br /> Pollution Prevention Plan, Plan C8.1, shall be implemented by t�e Developer and inspected and <br /> approved by the City or Mznnehaha Creek Watershed Distxict{"MCWD"). The City ar MCWD <br /> may impose additional erosion control requirements according to tlieir standards. <br /> 14. GRADING PLAN. The Plat shall be graded in accordance with the approved <br /> Final Grading and Drainage Plan,Plan C7.0. <br /> 6�EC�IV�D <br /> 132ZSj�t� �� JUN 21 201� <br /> � � -8 - �':� GITIf O�OR�(�� <br /> 1'r � <br />
The URL can be used to link to this page
Your browser does not support the video tag.