Laserfiche WebLink
C 13.0 Lighting Plan <br /> C14.0 Orono Industrial Blvd Plan and Profile ' <br /> C15.0-C15.1 Civil Details <br /> 9. DESIGN STAND.A►RDS. <br /> A. The Developer received Conditional Use Permit approval for a portion of <br /> the property ta be known as Lot l,Block 1, Crystal Bay'Business Center to allow the building on . <br /> this lot to have 50% to 60% buxnished block and 4Q% to 50% rock face block as alternative <br /> materials. . <br /> B. The Developer received variance�approval on September 11, 2006, for a <br /> �arrower street right of way than required by City standards. The right af way for the new s�reet. <br /> is to be 64 feet wide whereas�the subdivision regulations would require a 70 foot wide right of <br /> way. The sbreet shall be na,med"Orono Indusirial Boulevazd." Work to be performed on Orano <br /> Industrial Boulevard, Old Crystal Bay Raad, and the ditch upgrade an@.improvemen#s along <br /> Highway 12 shall be completed before a shell Certificate of Occupancy is issued for Lot 1,Block <br /> 1, ar Lat 1, Block 2. Work to be performed on Old Crystal Bay Road and fihe ditch upgrade and <br /> improvements along T�ighway 12 $ha11 be completed before a shell Certificafe of Occupancy is� <br /> issued for Lot 2, Biock 2. � ' <br /> 1Q. PERMITS. The Developer shali obtain or require its coniractors and <br /> subcontxactors to obtain any necessary perm�its,which may include: .� <br /> • Hennepin County for County Road Access an.d Work in County Rights-of- • <br /> Way <br /> • MnDot for State Highway Access <br /> • Minnesota Department of Health far Watermains <br /> � � NPDES Permit for Storinwater Connections � <br /> • MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal � <br /> . • DN#�for Dewatering . <br /> • City of Orono for Building Pernuts <br /> • Minnehaha Creek Watershed Ditstrict <br /> � FZECEIi/ED <br /> '32z8'"�1 JUN 21 2011 <br /> . -� - ,�:� � <br /> . `'`-'� � ` .. CI'T'Y t�F t�R�IVO <br /> ���":! > .; <br />