l � � <br />� <br /> I <br /> invert elevation of the laterals shall be 111.6. Cover laterals with 2" of clean sewer rock. Cover <br /> i entire bed area with a non-woven geo-textile fabric that is not so heavy as to prevent good air <br />� exchange. Install a sandy to loamy soil material over the rock bed with a depth of one foot at the <br /> �enter of the bed, tapering to six inches at the sides. Install six inches of topsoil over the entire <br />� mound. Establish a vegetative cover over the entire mound. The overall dimensions of the <br /> mound will be 83'L x 38'W. <br />� • Supply Line — Install 2" schedule 40 pvc supply pipe from the discharge pipe on the outside of <br /> the riser to mound rock bed. Use all high-pressure fittings. <br /> J • Header — Install all schedule 40 pvc matenals. Install a header by using three 2' sections of <br /> pipe, two 90 degree elbows and three tees. Connect the supply line to a tee just off center of the <br />� header(see drawing detail). Install all high-pressure fittings. <br /> • Lateral Network— Install 2" schedule 40 pvc pipe. Install four 61' laterals to the header. Prior <br />� to attaching laterals to the header drill 3/16" diameter orifices into the pipe with the orifices <br /> spaced 2.3 feet apart oriented downward. Drill the final orifice on each lateral oriented upward. <br /> Insta112" orifice shields to laterals below each orifice including the last upward oriented orifice. <br />� At the end of each lateral connect a 90 degree sweep followed by a 1.5" diameter ball valve. <br /> Install a 12" diameter plastic valve box over the ball valve assembly setting the box so the cover <br /> will be slightly above the finished grade when the mound is completed. Insta.11 all high-pressure <br />� �ttings. <br /> • Control Panel — Install an Orenco System, Inc. control panel model #MVP-S1PTR0 to control <br />� the pump operations on a timed basis (see attached data sheet). Install the contrdl panel in an <br /> interior space that will allow the alarin to be heard. Set the pump on/off timers to specifications. <br />' • Floats — Install Orenco mercury float assembly MF3A or equivalent for high-level alarm/timer <br /> override, timer on, and redundant off floats. Attach floats to float assembly bracket spacing <br />� floats as shown in drawing. Install float and pump wires out of the riser through pvc conduit up <br /> to a watertight splice box mounted on a post. Seal both ends of the conduit. <br />� 7. Limitations - Our investigation, layout, design, and recommendations are based on data submitted. <br /> If conditions considerably different from those described in this report are encountered, we must be <br />� notified. If proposed construction is changed, we must be notified to evaluate the effect of the <br /> changes on the wastewater system. Any changes to the design must be approved by the designer and <br /> w�ill be assessed additional design costs. If changes are made to the design without the knowledge <br />� and approval of the designer the design shall be void. All construction is to be in accordance with <br />� 3 <br />� <br />