My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-2011 Planning Commission Packet
Orono
>
Planning Commission
>
2011
>
02-22-2011 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 3:39:06 PM
Creation date
8/15/2012 3:38:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br /> Streets <br /> • A geotechnical report, R-value recommendation, and typical roadway and parking lot section <br /> shouid be submitted for review. <br /> • Plans should be submitted to Hennepin County for review and approval. <br /> • Plans have been submitted to the Fire Marshal for review. His comments are pending. <br /> Easements <br /> • Drainage and utility easements should be provided along all ponding areas, drainage ways, <br /> wetlands and wetland bufFers. <br /> • Ten feet wide utility easements should be provided over proposed utilities. To accommodate <br /> some lacation uncertainty with the soil conditions and directional drilling of the watermain and <br /> forcemain, the city may wish to consider waiting until the utilities are installed to determine the <br /> easement locations. <br /> General ,. .z <br /> • The proposed improvements will disturb more than one acre. This wiil require a permit from the <br /> MPCA. Final plans should include a detailed Storm Water Pollution Prevention Plan (SWPPP) for <br /> review and approval. <br /> • This project will disturb more than 100 CY of material triggering Orono's erosion control <br /> ordinance. City code requires that an erosion control financial security be submitted in the <br /> amount of 125%of the estimated cost to accompiish compiiance with the SWPPP. The <br /> estimated cost for the project is $8,000 and the required security would then be $10,000. This <br /> includes silt fence re-installation, site seeding, and maintenance of catch basin sediment <br /> protection devices. <br /> • Once the plans have been completed we will prepare an estimated cost for the site <br /> improvements as a basis for the necessary financial guarantee. <br /> If you have any questions, please call me at(651) 604-4894 or send an email to <br /> darren.amundsenCa�bonestroo.com <br /> Sincerely, <br /> � , i . <br /> Darren Amundsen <br /> Cc: Tom Keilogg <br /> Chris Mattson <br />
The URL can be used to link to this page
Your browser does not support the video tag.