Laserfiche WebLink
MINUTES OF THE <br /> ORONO PLANIVING COMMISSION MEETING <br /> Monday,Apri119,2010 <br /> 6:30 o'clock p.m. <br /> (#10-3458 JUDSON DAYTON,825 OLD CRYSTAL BAY ROAD, CONTINUED) <br /> • Lot 2 as proposed has 404 feet in width at the shoreline,410 feet in width at Old Crystal Bay Road, contains <br /> 12.59+dry acres in area, and houses three of the property's five wetlands. The existing home on the property <br /> as well as all existing accessory structures are proposed to remain at this time. The access to Lot 2 is proposed <br /> to be via the proposed Outlot A. All required LR-lA setbacks can reasonable be met when this lot is <br /> redeveloped with a new home. <br /> There are two driveways serving the property—one on the north and one on the south. The applicant is <br /> currently proposing to create Outlot A over the existing southerly driveway to access Lots 2 and 3. A lot 1 as <br /> shown will access off of Old Crystal Bay Road via the existing northerly driveway through a 50-foot corridor. <br /> This corridor is proposed as part of Lot 1. According to the subdivision regulations,this is defined as a"flag <br /> lot"and is not pernutted. A solution would be to create Lot 1 as a"back lot"to be accessed via an outlot. <br /> Orono's Comprehensive Plan indicates that a future trail is proposed along Old Crystal Bay Road,providing a <br /> trail connection from the Luce Line to Noerenberg Park. The City has not determined on which side of the <br /> road the trail should be developed. Staff recommends that the dedication of a 10-foot wide trail easement be <br /> required as part of this application. <br /> The City would require all the standard utility easements. In response to Hennepin County's requirements,the <br /> applicant has proposed a 33-foot wide right-of-way dedication extending to the center of Old Cry stal Bay <br /> Road. An additional 17 feet of dedication is shown. The City Council will be asked to consider whether a <br /> trail easement and/or expansion of the right-of-way along the east boundary of the property are required. It is <br /> Hennepin County's position that cities should obtain desired right-of-way at the time the property is platted. If <br /> this does not occur,then the County will expect City participation in paying for such easements if and when <br /> they are acquired by outright purchase or condemnation. <br /> The property has a large expanse of existing woods adjacent to Lake Minnetonka, five wetland bodies,and <br /> from Old Crystal Bay Road, an open view-shed into the wooded portions of the property. The Rural Oasis <br /> Study and Conservation Design Master Planning process has been formulated to help determine on a case-by- <br /> case basis what natural values should be preserved. <br /> The City's Conservation Design Ordinance would apply to this development. The developer should develop a <br /> plan which identifies and outlines measures for preserving the ecological assets unique to this property. This <br /> plan should be submitted to the City to be reviewed and implemented prior to consideration of the final plat. <br /> The Planning Commission should discuss whether elements identified within the large lot(ot 2) should be <br /> preserved now as part of this plat or if it is more appropriate to defer until Lot 2 is further subdivided in the <br /> future. <br /> Staff recommends revising the property lines to account for an access outlot and a back lot so the lot will <br /> conform to City Code requirements for frontage and access. A 30-foot wide outlot is the minimum which <br /> would be required to access a back lot. The applicant is creating a 50-foot wide corridor to accommodate the <br /> existing driveway. <br /> Further development of the property may utilize City sewer. Currently the property is located within the <br /> MUSA. However, it does not have direct access to sewer. There are a couple different options for bringing <br /> sewer to the site in the future. <br /> Page 6 <br />