My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-15-2010 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2010
>
11-15-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 4:43:23 PM
Creation date
8/14/2012 4:43:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,t <br /> Re:Comment No. 4: The Contractor is aware of the design�eguirements and has stated they <br /> have the ability and experience to accomp/ish these tasks Any future requirements shall be <br /> submitted di�ectly From the Contractor. <br /> The Owner must retain a qualified third party to review actual site conditions and determine <br /> whether or not design parameters used are valid, as well as to observe the work throughout <br /> construction operations. Major work items must be documented as being or not being in <br /> conformance with the approved construction drawings. Similar to Special Inspections in the <br /> International Building Code, this service cannot be performed by the Contractor doing the <br /> work. <br /> END � <br /> � <br /> Page2of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.