My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-18-2010 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2010
>
10-18-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 4:40:39 PM
Creation date
8/14/2012 4:40:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Cou1.N�t�l—(�o�-I� �sslorJ �t ruwr�S �3/p 9 — <br /> /o�i��/o <br /> range of fees charged for similar permits and licenses. Staff attempts to keep fees comparable <br /> to other cities and avoid extreme increases in one year. Various permits related to building, <br /> such as mechanical and plumbing, have not been increased in 5 years. <br /> • Sewer and water connection fees are unique to Orono and are based on initial construction <br /> costs of a project. An inflation factor is considered each year,generally in the range of 3%. <br /> • A 3%increase in sewer and water rates has been standard over last several years. An annual <br /> increase avoids a large increase in one year. <br /> • The Police Special Services rate is for an Officer who is paid at the overtime rate to provide <br /> special services at private functions or at Lord Fletcher's. A fair amount of revenue is collected <br /> over the year. <br /> • Planning and zoning fees have not been increased since 2004. A review was completed in 2003 <br /> when the basic application fee was$250. After the analysis, staff determined that a more <br /> accurate fee for the complete zoning application process was over$600,and the fee was <br /> increased in 2004 to$600. Staff felt it was an appropriate time to establish another increase. <br /> An option would be to increase these fees annually at 3%. Zoning application fees probably <br /> never totally cover the cost of staff time involved in the application process. <br /> • Council Members indicated the proposed changes to the 2009 fee schedule were acceptable. <br /> 4. Surface Water Management Plan Update—Authorize Commencement of Work <br /> • Bonestroo completed a Surface Water Management Plan (SWMP)for the City in 2001. There <br /> are a number of mandates that have occurred since formal approval of the plan that need to b <br /> addressed. A significant change is the requirement to meet specified levels of phosphorus <br /> reduction. <br /> • Because of the level of expertise required to address these changes, staff has discussed a <br /> proposal to update the SWMP with Bonestroo. The intent would be to complete the update of <br /> the SWMP in conjunction with the update of the Comp Plan. <br /> • The update could be funded from the Stormwater Fund. This Fund has 2 sources of revenue— <br /> quarterly fees and new development. Not much revenue in the future will be generated from <br /> development. The City will need to spend $20-25,000 to get the plan up-to-date. <br /> • Another element for consideration is to create a Design Guide that can be given to developers <br /> planning to work in the City. Bonestroo has two levels that could be done. Another option <br /> would be to have staff work on a Design Guide as time permits. <br /> • Council Members indicated approval to proceed with Bonestroo to work on the SWMP update <br /> and Phosphorus Reduction Plan,with formal action at the January 26th meeting. Staff will give <br /> further consideration as to how and at what level the Design Guide should proceed. <br /> • Part of the SWMP includes a CIP for$2,500,000 of stormwater improvements. Very little work <br /> has commenced, and the City has fallen behind in stormwater emphasis. The first 5 years of <br /> projects were priorities that the City identified, with most involving remedial work that needs to <br /> be done. Some ofthe Casco Point reconstruction work will involve stormwater improvements. <br /> 5. Process for Visioning and Strategic Goal Setting <br /> • Discussion with the Council and City Administrator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.