My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-21-2010 Planning Commission Packet
Orono
>
Planning Commission
>
2010
>
06-21-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 4:08:14 PM
Creation date
8/14/2012 4:08:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l � r <br /> Common spaces are provided with air mechanical systems. The commercial kitchen is <br /> provided with an e�chaust hood and make-up air. <br /> The building is designed in a bungalow style with steeper roof slopes and two-story sloped <br /> ends to blend with the fabric of the City of Orono and fit well into the site. The result is a <br /> high quality structure that fits very well with its surroundings. <br /> The proposed building consists of approximately 46,349 square feet including a first story of <br /> 25,814 square feet and second story of 20,535 square feet. <br /> The individual dwelling units proposed range from spacious studio units to lazge,two <br /> bedroom / two bathroom units. Most dwelling units contain full kitchens with full-size . <br /> refrigerator, dishwasher, range, and microwave. Studio units contain under-counter <br /> refrigerators and microwaves. All dwelling units include large showers. Two-bedroom <br /> dwelling units contain showers and tubs. Many units contain wheelchair/walker storage near <br /> . the dwelling unit entrance. <br /> Back-of-house common areas include offices, nurses stations, kitchen, staff room, laundries, <br /> and mechanical/electrical spaces. . <br /> Generous eight foot wide corridors with handrails serve all spaces within the building with <br /> light sconces at each dwelling unit entrance. Two full-size elevators are provided along with <br /> three exit stairs. <br /> Outdoor common areas include drop-off canopy, sitting areas near entrance, patio, and <br /> memory garden. , <br /> Development <br /> We participated in a Pre-Submittal Meeting on Thursday, 13 May 2010, and desire to proceed <br /> through the approval process as required by City of Orono as expeditiously as possible in ` . <br /> order to begin construction work in the fall of this year. <br /> The proposed project will be built in one phase with one request for Certificate of <br /> Occupancy. We estimate the project will require ten months to construct. Marketing of the <br /> senior living units will begin immediately upon project approval. <br /> We are aware of the key location of this project at a major entry point to the City, and desire <br /> to create a high quality development that expresses the ideals of the City of Orono. The <br /> proposed project will be a great asset to citizens of Orono and nearby communities as well as <br /> the City of Orono. <br /> If you should have any question,please contact me at 952-897-7862. <br /> Thank you, <br /> Mike Schraad ����I�E� <br /> Vice President <br /> Welsh Construction,LLC ° MAY 19 2010 <br /> �IT'Y�?F ORONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.