My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-17-2010 Planning Commission Packet
Orono
>
Planning Commission
>
2010
>
05-17-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 3:51:03 PM
Creation date
8/14/2012 3:50:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r F <br /> 10-3460 <br /> li May 2010 <br /> ' Page 4 of 7 <br /> by an architect and shall show the following for all structures other than single-family detached <br /> dwellings: building elevations; type and color of exterior building materials; typical floor plans; <br /> dimensions of all structures; and the location of all trash and recycling containers and all <br /> mechanical equipment. <br /> The applicant has provided some of the required information with this concept plan review. The <br /> remainder of the information must be submitted for the master plan review process. A materials <br /> sample board will also be required. <br /> Flexibilitv. The uniqueness of each RPUD requires that specifications and standards for streets, <br /> utilities, public facilities and subdivisions may be subject to modification from the city ordinances <br /> ordinarily governing them. <br /> According to City Code 82-281 the minimum right-of-way width for a private street serving 7+ <br /> � residences must be 50-feet in width with a paved roadway of 28 feet. The applicant has <br /> proposed private streets within the development of 24 feet in paved width. <br /> Traffic studies. The city may reguire a traffic analysis to be prepared by a registered traffic <br /> engineer approved by the city to assess potential traffic impacts on local streets. <br /> All access to the development is proposed to be via Fire Station Drive. Fire Station Drive is <br /> considered a local street. Willow Drive is classified as a collector street. The City has not <br /> requested a traffic study. <br /> Trails. When any portion of the project is within 1,000 feet of a public trail system, pedestrian <br /> access shall be provided to the trail system by means of a public trail constructed at the <br /> developer's expense. <br /> As shown on the Comprehensive Trail System Plan map (Exhibit I) a future trail is shown along <br /> Willow Drive which is intended to provide a future connection from Hackberry Park to the Old <br /> Crystal Bay Road Regional Trail. It is not determined at this point if a trail connection should be <br /> provided from Willow Drive to Holbrooke Park to the east. The applicant has discussed a <br /> potential trail with staff and the Planning Commission during the sketch plan review, however a <br /> trail has not been proposed at this time. <br /> Wetland &Wetland Buffer Setbacks. The wetlands on the property are classified as "Manage 2" <br /> wetlands requiring a 25-foot buffer and a 20-foot setback from the buffer. The proposed plan <br /> erroneously reflects a 30-foot wetland buffer. The structural encroachments into the buffer <br /> shown in the plans are somewhat alleviated by the correction in the buffer width. Portions of the <br /> streets and parking areas encroach into the buffer area. There are three units which encroach <br /> into the required 20-foot buffer setback. Wetland buffer averaging or variances and buffer <br /> setback variances will be necessary to develop the roads, parking areas and units as shown on <br /> the current plan. Based on the May 7, 2010 memo by John Smyth additional approvals may be <br /> required from the MCWD regarding the wetlands on this property — approval of the wetland <br /> delineations, permits for wetland impacts, etc. <br /> Master Plan Review—Additional Information Reauired In an effort to provide the City with the <br /> most detailed information, the applicant submitted plan information that for the Concept Plan <br /> review that exceeded the Concept Plan requirements. However there are a few additional plans <br /> necessary for the Master Plan review process: signage and lighting plans; and a plan outlining <br /> timing and phasing of the development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.