Laserfiche WebLink
� <br /> Date Application Received: 04/06/16 O <br /> Date Application Considered as Complete:04/29/16 � �O <br /> 60-Day Review Period Expires: 06/28/16 <br /> � � <br /> ti � <br /> To: Chair Thiesse and Planning Commission Members F� �� <br /> Jessica Loftus, City Administrator qkESH��� <br /> Item #2 <br /> From: Melanie Curtis, Planner mcc <br /> Date: 11 May 2016 <br /> Subject: #16-3826,Stonewood LLC o/b/o Charles and Terri Lahr, 895 Tonkawa Road <br /> After-the-Fact CUP-Grading <br /> Public Hearing <br /> Application Summary: The applicant is requesting after-the-fact approval of a conditional use <br /> permit allowing the import of approximately 3,000 cubic yards of fill material. <br /> Staff Recommendation: Planning Department Staff recommends approval with conditions. <br /> List of Exhibits <br /> ExhibitA. Application <br /> Exhibit 8. Stormwater Pollution Prevention Plan -SWPPP (Project Narrative) <br /> ExhibitC. Existing& Proposed Survey/Site Plan <br /> Exhibit D. Submitted Hardcover Calculations <br /> Exhibit E. City Engineer Comments <br /> Exhibit F. NPDES Permit Application <br /> Exhibit G. MCWD Permit Application <br /> Exhibit H. Aerial Photos <br /> Exhibit l. Property Owners List <br /> ExhibitJ. Plat Map <br /> Background <br /> As described in the applicanYs SWPPP the property owners own the subject property and the <br /> adjacent property at 875 Tonkawa Road where their new home is under construction. Earth <br /> material primarily resulting from the excavation of the new home on 875 was distributed on the <br /> property at 895 with the intent of creating two approximate 4-foot tall berms in the center of <br /> the property and along the south property line of 895. The purpose of the berms is to capture <br /> and hold the water runoff from the property to allow infiltration on the 895 property and to <br /> keep water from spilling on to the property to the south at 915 Tonkawa Road. Another <br /> approximately 6 foot tall berm area is proposed along Tonkawa Road to provide for privacy and <br /> sound screening. They intend to hydro-seed the disturbed areas with a seed mix appropriate to <br /> the level of sun exposure and comprised of native flower and plant species. <br />