My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-18-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
04-18-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 11:10:18 AM
Creation date
8/25/2016 10:50:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. The City Council authonze Bolton and Menk to begin engineering and design upon receipt of an <br /> escrow from the Eisinger developer in the amount of$47,369 which is equal to the proportion of the <br /> engineering fees attributable to that development using the sanne proportions outlined in the ResoIurion <br /> 6530 for the entire project. <br /> b. Upon Final Plat far the Eisinger Development the City Council would consider authorizing staff <br /> to soEicit bids for the construction of the sewer and water extensions. <br /> COiTNCIL ACTIUN REQUESTED: Consider a motion to approve engineering proposal from Bolton <br /> and Menk of not to exceed�149,500 to commence upon the receipt of an escrow from Lake West LLC in <br /> the amount of$47,369 for the design and engineering of the sewer and wa#ez main extensions along <br /> CSAH112/Wayzata Blvd.. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.