My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
02-16-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:27 PM
Creation date
8/25/2016 9:13:01 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Many roads approaching 30-40 years in age and increasing pressure is expected toward the city to <br /> 4 Private roads standards/poliaes take them over and fix them up—A poficy should be developed to respond to these requests. 14 <br /> Roseviile or Richfleld was recently(11/15�profiled in the paper as an example of a process <br /> Create an option whereby a landowner can obtain approv�l for extending the every 3 year pumping <br /> 19 Septic Code updates reg,a�dtng pumping requirement on a year-by-year basis where documer�tation is provided and a managemerrt plan <br /> maintenance intervals&T e IV s stems a reement is entered fnto re uirin verification that se tic tanks are not needin to be um ed et, 13 <br /> YP Y B q B P B P P Y <br /> especially in the case of 8ig Island where the transportation cost is exceedingly high <br /> Sbpe Fallure and Stabflizatton Ordlnance or here is an opportunity to improve the process of dealing with slope failures before they occur and <br /> 8 Policy in emergency situations;standards,review process,collabo�ation with MCWD,etc.would benef'rt 12 <br /> residents. <br /> Code aliows certafn accessory structures(pools)withln a ceRain size to be built in frorrt of the <br /> 36 Accessory structures and pools principal building,outslde of the required yard.Historically,staff has not permitted any structure. 12 <br /> Further,78-1436 allows for a 15 side yard setback for accessory structures between 750 and 1000 <br /> sq.ft. Setbacks for accessory struc[ures should be reviewed <br /> 7 Sewer Connection Charges Palicies me existing system of determining connection charges should be reviewed to ensure they are 1Z <br /> e uitable and uniform. <br /> The appeals process as outlined in 2�1 does not stipulate a timeline for filing the appeal. There <br /> 37 Appealtimeframe 1�, <br /> should be a deadline to avoid protracted processes. <br /> 18 Septic Code Review the Septic cade,compare with State/County requirements. Determine if the differences are 11 <br /> worth the added layer of review and permitting. <br /> The statute allows for certain subdivisions to be reviewed differently,skipping a planning <br /> L Lot splits commission process. could be reviewed and do not need to be,adding time,expense,and 9 <br /> roadblocks unnecessarily. Changes could save staff and applicant time. <br /> 16 Special lot combinations Specia!lot combos should be clarified to exclude non-riparian lots in calculation of average 8 <br /> lakeshore setbacks. Drafted,need to schedule. <br /> Z Comp Plan text/map amendments re:densities The Comp plan notes certaln denslty ranges. The future Comprehensive Plan should be clear as to <br /> in certain districts #he goal of certain districts in terms of density and development atterns. 8 <br /> 24 Vacation Rentals Residents are renting their homes on a short term basis. Renters'behavior impacts the peace and � <br /> enjoyment of the rest of the neighborhood. Vacatio�rentals should be regulated. <br /> 9 SWMP-zoning code revisions to formalize Ordinances codifying the Surface Water Management Plan standards must be adopted to fulfy � <br /> implementation implement the plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.