Laserfiche WebLink
� <br /> ARCHISTRUCTURES <br /> Jerry Pa{ms P.E. <br /> Structural Engineer <br /> 416 Hennepin Avenue East <br /> Minneapolis MN 55414 <br /> 612/378 0393(Voice) <br /> 612/378 3736(Fax) <br /> archistructures.inc�gmail.com <br /> Item#2: Second tloor shower addition: Roof framing: Construction of the roof and end wall <br /> for the new shed dormer to enclose the shower has been completed. The roof rafters are <br /> supported by a new LVL beam which also supports an exisring gable end wall. (See photo <br /> directly below.) This framing solution was verbally discussed with the contractor during my <br /> last site visit. The end wall with a large window opening has also been properly framed. (See <br /> photo on following page) The work has been completed in accord with the structural docu- <br /> ments as well as my additional verbal instructions to the contractor,and so is approved by me. <br /> ,, - <br /> ��. <br /> � <br /> ,_ . _. � _ �..�:.... �� `�� ��� <br /> 1 NOVEMBER 2014/PAGE 2 QF 4 <br />