Laserfiche WebLink
ARCHISTRUCTURES <br /> Jerry Palms P.E. <br /> Structural Engineer <br /> 416 Hennepin Avenue East <br /> Minneapolis MN 55414 <br /> 612/378 0393(Voice) <br /> 612/378 3736(Fax) <br /> archistructures.inc�gmail.com <br /> Item#3: Second floor shower addition: Floor framing: Floor construction is mostly existing <br /> 2x10 joists, quite adequate to support the new shower and remodeled bathroom. Contractor <br /> has drilled new holes (approximately 2 1/2" diameter) in several short span 2x10's for a new <br /> waste pipe. (See photo directly below.) IVo repairs are needed for the existing 2x10's because <br /> they are adequately over-designed. <br /> �'� <br /> o:, E� <br /> �: � <br /> ���. <br /> ,��, . <br /> One existing joist, which had been previously damaged with an oversize hole was repaired by <br /> sistering a piece of lumber to the side. (See photo directly below.) The work which I have <br /> described for the floor framing has been properly completed,and so is approved by me. <br />