My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00088 - New Home
Orono
>
Property Files
>
Street Address
>
E
>
Edgewood Hills Road
>
1050 Edgewood Hills Road - 02-117-23-13-0003
>
Permits/Inspections
>
2016-00088 - New Home
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:06:22 PM
Creation date
8/23/2016 9:09:05 AM
Metadata
Fields
Template:
x Address Old
House Number
1050
Street Name
Edgewood Hills
Street Type
Road
Address
1050 Edgewood Hills Rd
Document Type
Permits/Inspections
PIN
0211723130003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � �O�O <br /> C ITY OF ORONO <br /> � �, Street Address: Mailing Address: Telephone(952)249-4600 <br /> yc. G� 2750 Kelley Parkway P.O.Box 66 I Fax (952)249-4616 <br /> �.9k�SH��F, Orono, MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> July 21, 2016 <br /> Rick Theisen <br /> Streeter&Associates <br /> 18312 Minnetonka Blvd <br /> Wayzata, MN 55391 <br /> Re: Building Permit Applitation#2016-00088 <br /> 1050 Edgewood Hills Road <br /> On June 30, 2016 the City received revised building and landscape plans and an updated survey for a new single family <br /> home. Staff conducted a preliminary review based on the information provided and requests the following items be <br /> submitted or revised in order for your application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey. Our engineer has reviewed the survey submitted and has the following comments: <br /> a. The plan depicts fill as deep as 10-12 feet in places along the western side of the property. Please have <br /> the surveyor provide a calculation for the amount of fill that is being brought onto the site. <br /> b. As drawn it appears the sewer service cleanout structure will be 4 feet underground. The applicant <br /> should provide a plan for maintaining access to the structure for future maintenance needs. <br /> c. Retaining walls are grayed out which would indicate they are being removed. Please provide <br /> clarification. <br /> d. Show proposed well location on survey. <br /> e. Show rock construction entrance. <br /> 2. Landscape Plan. A landscape plan dated June 27, 2016 was received. We have reviewed and request <br /> clarification on the following: <br /> a. Retaining walls shown on the survey are not shown on the landscape plan. Please clarify. <br /> b. There appears to be proposed grading in the"no grading" area. Please clarify <br /> Any proposed patios,grading,sidewalks, retaining walls shown on the landscape plan should also be reflected <br /> on the survey. <br /> 3. Pool Permit. A pool permit was submitted without plans and cannot be approved. We will void this permit <br /> and refund the advance plan review fee paid. We will redline the pool shown on the survey and require a new <br /> pool permit application be submitted by the pool contractor prior to pool construction. <br /> Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on <br /> the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> .-� <br /> Christine Mattson <br /> Planning Assistant <br /> c via email Rick Theisen <br /> Barbara Steiner and Tom Rassieur <br /> Dan Thurmes, Cornerstone Land Surveying <br /> James Robin, Landscape Architect <br /> Roger Peitso, Building Official <br /> enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.