My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-21-2008 Planning Commission Packet
Orono
>
Planning Commission
>
2008
>
04-21-2008 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2012 8:30:54 AM
Creation date
7/27/2012 8:30:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Item#09-CC Agenda-OS/19/07 � , <br /> ' File#07-3259[Tomll�ages 41J <br /> ����� ' <br /> MINUTES OF THE <br /> ORONO PLANNING COMMISSION . <br /> Tuesday,February 20,2007 � <br /> 6:00 o'clocic p.m. <br /> Winer noted this is the fourEh time a proposal for this pro�erty has come before the Planning <br /> • Commission and that perhaps better direction shol�ld be giveii fo the applicants. . <br /> • Rahn stated he would like to see fut�tlter reductions in the hardcover and thafhe is not iii favor of the � <br /> front yard setback. " <br /> Kroeger stated when hardships are dernonstrated;the City has granted variances to hardcover. <br /> Jacobson stated if the addition is moved to the back or to the side,they would end up with a footprint . . <br /> that is similar to what etists. Jacobson inquired whether there would still be a discttssion of rebuild, . <br /> new construction or remodel if they relocate the addition. Jacobson stated he would like better <br /> � direction from the Planning Commission ou that item. � � , . <br /> Rahn stated if a new builder is hired each tirne the plan changes,there likely would be a lot of round- , � . <br /> about and that he uuderstands the builder would like to have consistent direction. Rahn stated the ,� � <br /> Plauning Commission has provided direction to the previous builder. <br /> I{roeger noted this is the first time a front setback and a side setback have been requested and that <br /> previously it was largely a hardcover issue. . <br /> Kempf stated the City's review of lakeshore rebuilds shows that for lots consistiiig of 16,000 to 24,000 � � <br /> square feet,only two of si�properties were o anted variances in e.ccess of 25 percent. Keuipf stated if � <br /> the foundation is relocated away fi-om the road,the question is whether the applicants would be held to . <br /> the 25 percent hardcovec or whether they would be allowed 28 percent. � � � . . <br /> Jacobson stated that is what he would like to know. Jacobson stated in his experience as a fortner . � <br /> planning commissioner,variance requests are not predetennined by previous variances and that they <br /> stand alone on their merit. Jacobson stated it is tempting to loolc at other properties and what has been . <br /> approved but that is not always productive. Jacobson stated in looking at this project on its own n�erit, <br /> the hardcover will more than likefy end up at 28 perceilt. � <br /> Rahn stated he might be willing to allow the 28 percent if the fi�ont setback encroachment is removed. � . � <br /> . PAG� 22 . � . <br />
The URL can be used to link to this page
Your browser does not support the video tag.