Laserfiche WebLink
• �� <br /> V <br /> � Date Application Received: 12/19/07 � , <br /> Date Application Considered as Complete: 1/4/08 <br /> 60-Day Review Period Expires: 3/4/08 � <br /> To: Chair Kempf and Planning Commission Members <br /> � Ron Moorse, City Administrator <br /> From: Evelyn Turner, City Planner Q� <br /> .7 <br /> Date: January 22, 2008 . <br /> , Subject: #08-3338 Tom and Kathy Ziegler,2264 Shadywood Road , <br /> -Variances � <br /> .. . . -Public Hearing . - . <br /> ��< . . • � <br /> -- --- -- ---- -- ---- ----- ------ , . <br /> --------------------------------- �_- , . <br /> Zoning District: LR-1C (0.5 acre) � � . .. . � � <br /> Lot Area: 0.28 acre ' � � � � � <br /> Lot Width: 44 feet feet � ' � � � <br /> � Application Summary: The owners request a setback variance to construct an attached <br /> garage with a 11.2 foot setback from the right of way of Crystal Bay Road when a 15 <br /> foot setback is required and a setback variance to add an open porch with a five foot <br /> setback from the right of way of Crystal Bay road when a 15 foot setback is required. � <br /> Also requested are a lakeshore setback variance to create an open porch over a portion <br /> of the enclosed porch and a hardcover variance to a11ow the steps on the lake side of the <br /> house to be relocated to the Crystal Ba Road side of the enclosed orch. <br /> Staff Recommendation: Plarining Department Staff recommends partial approval of the <br /> ap lication. <br /> Pertinent Zoning Ordinance Sections <br /> 78- 71(2) and (3)(a)Replacment of Non-conforming structures <br /> 78-350 LR-1C Setbacks <br /> 78- 1279 Lakeshore Setback • - <br /> 78-1288 Hardcover <br /> List of Exhibits <br /> A. Application � � <br /> B. Hardship Documentation Form <br /> C. Hardcover Calculations � <br /> D. Area Map <br /> E. Survey—Existing Conditions <br /> F. Survey—Proposed <br /> G. Existing and Proposed Elevations House and Plans <br /> H. Detail of survey annotated by Staff to show proposed setback variances <br /> I. Existing and Proposed Front Elevation superimposed by Staff <br /> J. City Engineer's Review <br />