My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00542 - new mound septic
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
515 Ferndale Road North - 36-118-23-14-0006
>
Septic
>
2010-00542 - new mound septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:01:49 PM
Creation date
8/16/2016 2:04:58 PM
Metadata
Fields
Template:
x Address Old
House Number
515
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
515 Ferndale Road North
Document Type
Septic
PIN
3611823140006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 62.5 ft X 10.0 ft X 1.0 = 625.0 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: <br /> 625.0 ft3 = 27 = 23.1 yd3 <br /> Add 20%for constructabitity: 23•� yd3 X 1•2 = 2�•8 Yd3 <br /> B. Calcutate Clean Sand Vofume: <br /> Upslope Volume: ((Ups(ope Mound Height- 1)x 3 x Media Length)=2=cubic feet <br /> (( 3.3 ft - 1) X 3.0 ft X 62.5 )=2 - 215.6 ft3 <br /> Downstope Volume: ((Downslope Height- 1) x Downslope Absorption Width x Media Length)=2 =cubic feet <br /> (( 4.5 ft- 1) X 5.4 ft X 62.5 )=2 - 328.1 ft3 <br /> Ends(ope Vo(ume: (Downslope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.5 ft- 1 ) X 3.0 ft X 10.0 ft = 105.0 ft3 <br /> Volume Under Rockbed: Average Sand Depth x Media Width x Media Length =cubic feet <br /> 1.9 ft X 10.0 ft X 62.5 ft = 1187.5 ft3 <br /> Total Clenn Sand Volume: Upslope Volume +Downs(ope Volume +Ends(ope Volume + Yolume Under Media <br /> 215.6 ft3 + 328.1 ft3 + 105.0 ft3 + 1187.5 ft3 = 1836.3 ft3 <br /> Divide ft3 by 27 ft3/yd3 to catcutate cubic yards: 1836.3 ft3 = 27 = 68.0 yd3 <br /> Add 20%for constructability: 68.0 yd3 X 1.2 = 81•6 yd3 <br /> G. Calcutate Sandy Berm Volume: <br /> Tota[Berm Voiume (approximnte): Average Mound Height x Mound Width x Mound Length T 2 =cubic feet <br /> ( 3.9 ft X 47.0 ft X 91.0 )=2 - 8340.2 ft3 <br /> Total Mound Volume- C[ean.Sand vo(ume=cubic feet <br /> 8340.2 ft3 - 1836.3 ft3 = 6503.9 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calcutate cubic yards: 6503.9 ft3 = 27 = 240.9 yd3 <br /> Add 20%for constructability: 240.9 yd3 x 1.2 = 289•1 yd3 <br /> D. Catcutate Topsoii Materia( Vo(ume: Tota(Mound Width X Tota(Mound Length X.5 ft <br /> 47.0 ft X 91.0 ft X 0.5 ft = 2138.5 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calcutate cubic yards: 2138.5 ft3 = 27 = 79•2 yd3 <br /> Add 20%for constructabitity: �9•2 yd3 x 1.2 = 95•� yd3 <br /> I hereby certify that I have completed this woric in accordance with ali applicable ordinances, rules and laws. <br /> �_ <br /> Joseph Oison 810 10/29/2008 <br /> (Designer) � (Signature) {License#) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.