Laserfiche WebLink
� 2-15-200� window&donr area gross exposed wall area DESIGN ALLOWABLE (from table above) � <br /> Part II. DEPRESSURIZATION PROTECTION <br /> Check option used: ❑ Aggregate(complele aggregate worksheet on next page) ❑ Prescriptive(complele���orksheet belo�a�) <br /> ❑ Pertbrmance(submit test report prior to tinal inspection) ❑ No luel burning equipment <br /> PRESCRIPTIVE PATH WORKSHEET <br /> INsrRuc�rioh's COMBUSTION EQUIPMENT SCHEDULE Permitted E ui ment <br /> (cheek all t es ro osed) Path 0 Path 1 Path 2 Path 3 <br /> Step 1. Complete the Combustion Space heating Sealcd combustion Y Y Y y <br /> /.'quipment Schedule on the right. ❑ Direct or o�ti�cr vented N Y Y Y <br /> Step 2. Choose a Make-up Air Path���ith u ❑ Atmos hericall vented N N Y* Y <br /> Y(Yes)for all selected equipment. Water heating Sealed combustion Y Y Y Y <br /> Step 3. Complete the table belo�v for the Direct or ower vcnted N Y Y Y <br /> Aiake-up Air Pa�h chosen,indicatin� ❑ ntmos hericall �vented N N N Y <br /> flows in cfm for exhaust and makc- Hearth -gas .$� Scaled combustion Y Y Y Y <br /> Up air methods proposed. Only the 0 Direct or ower vented N Y Y Y <br /> capacity of largest exhaust appliance ❑ Atmos hericall vented N N Y* N <br /> in each category need be considercd. Nearth- solid ❑ Closed controlled N � Y Y* N <br /> Step 4. Fill out the Passive h�ake-t�p:�ir fuel � ❑ Decorati��e N N Y* N <br /> Opening Schedu/e on the next pagc. *Onl one atmos herieall vented a lianee ma�be installed in Yrescri tive Path 2 <br /> ❑ pat�1 � — PI'eSCC1ptIVe Make-Up A1C MetflOC� E�aust Passive Passive Powered Make-up <br /> Infiltration O enin <br /> Clothes dryer: Passive infiltration for up to l75 efms � <br /> Passive o enin s for cfms over 175 <br /> Kitchen eshaust: Passive i�filtration for up to 250 cfm <br /> � Passive openings for cfms over 250 <br /> Powered to match flow for efms over 500 <br /> Other e�aust:i Passive openings for up to 140 efm <br /> Po�vered to match flo�v for efms over 140 N/A <br /> #Need not include central vacuum exhaust in Path 0. TOTALS <br /> ❑ Path 1 — PI'eSCI'1ptlVe Make-U[) f�ll' MCthOC� Exhaust Passive Passive Powered Make-up <br /> Infiltration O enin '" <br /> Clothes dryer:$ Passive infiltration for up to 175 cfm <br /> Passive o enin s fbr cfms over 175 <br /> Kitchen exhaust: Passive openings for up to 250 cfm <br /> Powered to match tlow for cfms over 250 N/A <br /> Other exhaust:,�'. Passive openings for up to 140 ef'm <br /> Powered to match t7ow tor cfms over 140 N/A <br /> TOTALS <br /> � If closed controlled combustion solid-fuel burning appliance is installed in Path 1,then the clothes dryer and any central vacuum that <br /> exhausts to outside must be rovided with make-u air b assive o enin �to match flow.Otheru�ise need not include central vacuum. <br /> ❑ Pat�l 2 — Pt'eSCI'I�t1VC Ma�{e-U�l f�ll' MethOC� Exhaust P'assive Passiti•e Powered Make-up <br /> Infiltration O enin <br /> Clothes dryer: Passive openings for up to 175 cfm <br /> Powered to match flow for cfms over 175 N/A <br /> Kitchen exhaust: Po�vered to match f7ow N/A N/A <br /> Other exhaust: Powered to match flo�v N/A N/n <br /> TOTALS N!n <br /> ❑ Path 3 — P1'eSC1'lptive Make-up AiC MethOd Exhaust Passive Passive Powered Make-up <br /> Intiltration E) enin � <br /> Clothes drver: Yowered to match flo�a N-,� NiA <br /> Kitchcn exhaust: Po�vered to match flow N/A N/n <br /> Other exhaust: Powered fo match flow N/A N/A <br /> TOTALS N/A N/A <br /> 14 <br />