My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2005 Council Minutes
Orono
>
City Council
>
2005
>
12-12-2005 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 3:52:21 PM
Creation date
7/25/2012 3:48:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY. COUNCIL MEETING <br />Monday, December 12, 2005 <br />7:00 o'clock p.m. <br />(5. CHARLIE JAMES, 425 OLD CRYSTAL BAYROAD NORTH, Continued) <br />Todd Planting, Project Manager with Ames Construction, stated the elevation of the property is proposed <br />to go to 1029', which matches the road elevations near Old Crystal Bay, plus or minus a foot. Planting <br />stated the site would be reseeded upon completion. <br />McMillan inquired whether the trucks would be able to access that section of the property. <br />Planting stated there would be a 30 -foot buffer between the wetland and that they are planning to leave <br />that area low to provide for drainage. Planting illustrated where they would access the site on the <br />overhead. <br />Sansevere inquired whether there is any possibility that the Dumas site would experience any runoff. <br />Planting stated all drainage would be directed towards the wetland. <br />Murphy moved to adopt the interim plan and to authorize staff to issue an interim land alteration <br />permit for topsoil stripping and filling in the southern portion of the James property, subject to the <br />recommendations of the City Engineer and the obtaining of the necessary permits from the MCWD <br />and the Minnesota Pollution Control Agency. <br />Kellogg stated his recommendations relate mainly to sediment and erosion control, noting that the <br />drainage issues have been addressed by the comments of Mr. Planting. <br />White pointed out there would be some additional work completed in February. <br />Gaffron stated this issue would be discussed at the January 17 °i Planning Commission meeting, with the <br />affected neighbors being notified of the public hearing. <br />Motion seconded by Peterson. <br />White noted no development is being proposed for the James site at the present time. <br />VOTE: Ayes 5, Nays 0. <br />Murphy commended Ames Construction on their work relating to the new Highway 12 project, noting <br />that parts of the project have been completed early. <br />6. #05 -3131 STEVE BOHL OF BORLAND DEVELOPMENT, INC., 190 WILLOW DRIVE <br />NORTH AND 177 GLENDALE DRIVE — PRELIMINARY PLAT APPROVAL AND REZONING <br />Steve Bohl, Applicant, was present. <br />• <br />Gaffion stated the applicant is requesting preliminary plat approval and rezoning for a portion of the <br />property that consists of 10.28 acres, including the church property at Glendale just east of Willow. The <br />property is currently zoned RR -1B, 2 acre single family rural residential, with the applicant requesting the <br />zoning be changed to a Residential Planned Unit Development. Gaffron noted the church property would <br />remain as RR -1B. . <br />PAGE 4 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.