My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-28-2005 Council Minutes
Orono
>
City Council
>
2005
>
11-28-2005 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 3:52:06 PM
Creation date
7/25/2012 3:47:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, November 28, 2005 <br />7:00 o'clock p.m. <br />(Charlie James, Continued) <br />Gaffron stated it is Staff's anticipation that the stripping and stockpiling of the topsoil would commence <br />almost immediately, with fill being brought to the site in the spring. <br />Murphy stated Ames Construction would prefer to haul the dirt to the site here in Orono rather than <br />Delano or Independence. Murphy stated the topsoil would be scraped off the top of this site and moved to <br />the side while the fill is being hauled in. <br />White inquired how the grade on this site would change. <br />Gaffron stated he has not received ample information to address the change in grade and some of the <br />other concerns raised tonight. Gaffron stated it could be a few weeks before the appropriate information <br />is provided. <br />Moorse stated the developer has been told that they are not to be filling this lot up high enough to create <br />walkout lots. <br />White expressed a concern about the appearance of the lot while the stockpiling was occurring. <br />Murphy stated he had the understanding that Ames was going to be the applicant and would be paying the • <br />fees and obtaining the conditional use permit. <br />Gaffron stated Ames is the applicant. <br />Murphy pointed out that there really is no connection between Ames and the property owner but that this <br />is an opportunity to place some fill in an area that needs to be brought up to grade and provide additional <br />dirt for a berm for screening but that the amount of fill would be controlled. Murphy stated he was <br />unaware of the lack of information submitted. Murphy stated he would be happy to speak with the <br />contractor about this situation. <br />Gaffron stated Ames should work with the property owner on the temporary fill plans for this lot. <br />Murphy stated he is confident that Ames Construction would take the appropriate steps to deal with <br />possible erosion and some of the other issues and that he would be supportive of the permit if Ames <br />Construction provides the required documentation. <br />McMillan inquired what kind of protection the homes in the immediate area would receive. <br />Gaffron stated there are some limits to what protections can be placed on the hauling in of the fill and that <br />there likely are going to be some impacts to the neighboring properties. Gaffron stated the City can <br />require mulch, seed and hay on the fill, but that there may be times when there is not vegetation growing <br />on the dirt and that there may be an issue with dirt blowing. <br />PAGE 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.