My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-2005 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
2000-2009
>
2005
>
09-12-2005 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 3:51:23 PM
Creation date
7/24/2012 4:56:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�p <br />MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, September 12, 2005 <br />7:00 o'clock p.m. <br />(3. #05 -3141 JEFFREYAND ETHEL GUSTAFSG <br />White stated he is not opposed to this application but <br />the City Engineer. <br />Gustafson stated they do have a good working relatic <br />professional staff to do their surveying and grading v <br />Murphy indicated he also is willing to approve it sub <br />Murphy moved, White seconded, to adopt RE; <br />area variance and conditional use permit for J <br />subject to the review and approval of the City <br />VOTE: Ayes 4, Nays 0. <br />4. #05 -3143 DAN HESSBURG OF HESSBUI <br />ROAD — VARIANCE — RESOLUTION NO. 5377 <br />Dan Hessburg, Applicant, was present. <br />N, 4203 NORTH SHORE DRIVE, Continued) <br />t he would like it to be reviewed and approved by <br />with the City and that they do hire <br />to approval by the City Engineer. <br />PION NO. 5376, a Resolution granting a lot <br />and Ethel Gustafson, 4203 North Shore Drive, <br />per of the grading and drainage plan. <br />DEVELOPMENT, INC., 774 TONKAWA <br />Gundlach stated the applicant is requesting a lot area'variance to permit construction of a new residence <br />on an existing lot .36 acres in area where 1.0 acres is normally required; a lot width variance to permit <br />construction of a new residence on an existing lot 74 feet in width at the shoreline and 61 feet in width at <br />is the 75 foot setback where 140 feet is normally required; a hardcover variance to permit 29.8 percent <br />hardcover within the 75' -250' zone where 25 percent is normally allowed and 27.2 percent currently <br />exists; and a hardcover variance to permit 39.4 percent hardcover within the 250 -500' zone where 30 <br />percent is normally allowed and 66.8 percent currently exists. The applicant is proposing to tear down the <br />existing residence and construct a new home within the required setbacks. <br />• <br />The Planning Commission did review this applicati <br />approval of the lot area and lot width variances but <br />zone be reduced to 27.2 percent. In addition, the P <br />turnaround apron be put back into the 75' -250' zon <br />the turnaround since this property abuts a county r( <br />Gundlach stated the applicant did submit a revised g <br />Engineer's comments. Gundlach noted there is a sn <br />apron to avoid runoff onto the neighboring property <br />Hessburg stated the drainage was based on the e). <br />Engineer to resolve any drainage issues that may <br />Murphy stated he would like it noted that the 27.2 p <br />the circumstances. <br />at their August meeting and recommended <br />commended that the hardcover within the 75' -250' <br />ping Commission recommended that the 8' by 8' <br />Gundlach noted the City's code technically requires <br />ing plan, which meets the majority of the City <br />issue regarding the grading of the turnaround <br />g grade and that he is willing to work with the City <br />remain. <br />PAGE 3 <br />II <br />hardcover appears appropriate for this lot under <br />
The URL can be used to link to this page
Your browser does not support the video tag.