My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-2007 Council Minutes
Orono
>
City Council
>
Minutes
>
2000-2009
>
2007
>
11-26-2007 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 4:09:13 PM
Creation date
7/23/2012 3:59:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />ORONO CITY <br />Monday, P <br />7:00 <br />( #07 -3310 Ryan Companies US, Inc., 2765 W <br />Kellogg stated they have worked with MnDOT <br />conditions. As a condition of approval, MnDO] <br />protect the discharge and control the rates, and t <br />ensure that any runoff that ultimately gets to the <br />along the new Highway 12 corridor. Kellogg st <br />going to have to be made should be made up fro <br />avoid the need for the City to monitor the hardci <br />White asked how that would impact Morrie's. <br />OF THE <br />INCIL MEETING <br />aber 26, 2007 <br />ck p.m. <br />to Boulevard West — Continued) <br />gain additional land for runoff subject to a couple of <br />s requiring modification of the outlet structure to <br />y are also requiring that the ditch be armored to help <br />.tch will stay in the ditch and not impact their work <br />;d in his opinion the improvements that are ultimately <br />rather than down the road at some indefinite time to <br />on the site and then require the work. <br />Kellogg stated the breakdown of the drainage area is 70 percent this site and 30 percent Morrie's, and <br />that primarily the Morrie's site drains easterly to the existing ditch and would not to have utilize the <br />ditch in question. i <br />• Murphy stated to his recollection at one time there was an issue with water draining off this property <br />R and crossing Morrie's property in high rain situations and that the City had requested that issue be <br />addressed. Murphy asked whether that work has been completed. <br />Turner indicated it is her belief that would be addressed at the time of the construction of the first <br />building. <br />McJilton stated that would be completed with the renovation of the first building and should be <br />completed in the spring. <br />Murphy asked for clarification on the language concerning whether the work would be completed with <br />the renovation of the building or construction of I the first building. Murphy stated he would like to see <br />the work completed with renovation of the first building. <br />McJilton stated it would be done in conjunction) with the renovation of the building and not construction <br />of the first new building. <br />i <br />i <br />PAGE 5 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.