My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-11-2007 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
2000-2009
>
2007
>
06-11-2007 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 4:07:36 PM
Creation date
7/23/2012 3:50:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, June 11, 2007 <br />7:00 o'clock p.m. • <br />(3. #07 -3266 VOGUE HOMES ONBEHALF OFKARENAND BENJAMINMILBRATH, <br />1404 BALDUR PARKROAD, Continued) <br />Gaffron concurred, pointing out that in the 1980's the City determined that deck railings more than <br />6' above grade are considered part of the home structure and should be part of the delineation. <br />Betsy Nusbaum, 3480 North Shore Drive, asked what the difference is between the criteria for a lot <br />with a structure on it as opposed to those that become `vacant'. <br />Gaffron stated that, although a total rebuild or new construction is subject to virtually tougher <br />standards than a remodel project of an existing structure, on a substandard lot it is not unusual to <br />see 40% hardcover on redevelopment projects. <br />Turner noted that the proposed hardcover for the area between the two 0 -75' zones is 43.8 %. <br />Maintaining that a recent home constructed to her west was granted their certificate of occupancy <br />having never completed any grading or even having planted grass to date, Nusbaum asked how the <br />city could ensure that the obligations of final grading have been met on a property, as there are no <br />ramifications if they do not live up to their end of the bargain. <br />Moorse explained that the certificate of occupancy should be used as the final leverage to ensure <br />the owners have met their obligations. <br />Rahn stated that there should be a contingency placed on these types of sensitive properties to • <br />ensure that the certificates of occupancy do not get issued until the drainage and grading is <br />complete. <br />Kellogg agreed that a condition should be added to require an as -built survey be done to ensure the <br />final grading is in general conformance with the application. He acknowledged that inevitably over <br />time some of this tends to change. <br />Turner stated that, as this is floodplain, the City can require that an as -built survey be provided at <br />the time of certificate of occupancy. <br />McMillan suggested that a house plan should be designed around the necessary side yard setbacks, <br />and what constitutes a good swale in order to meet the drainage requirements for the area, since so <br />much hinges on this. <br />Kristi Anderson, 1408 Baldur Park Road, thanked the applicant for bringing the height down and <br />thanked the Council for their consideration of the drainage concerns in the area. She reiterated the <br />need to build in stipulations that the drainage be complete before the certificate of occupancy is <br />issued, since there are three specific cases on the street in which this was not the case. In addition, <br />she asked the Council to keep in mind that Planner Turner's own report acknowledges that the <br />average hardcover in the area is 34 %, despite the 40% on Mr. Reid's property. <br />Mayor White suggested the applicant be more creative in resolving the drainage issues, perhaps <br />consider a cistern system, and even pick up a Fine Home Building magazine to find more small <br />home plan ideas to incorporate into his design. • <br />PAGE 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.