Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, February 12, 2007 <br />7:00 o'clock p.m. <br />(4. #06 -3231 WILLIAMS. DAMPIER, 3550ITlYPLACE, Continued) • <br />Turner stated the structural coverage on the lot would increase from 14.87 to 16.18 and the hardcover in <br />the 75 -250 foot zone would decrease fiom 48.9 percent to 45.1 percent. , <br />Murphy commented he is amazed the applicant can remember all these details but that he is troubled by <br />the fact the applicant did not realize he should have waited until the building pernlit was issued. Murphy <br />stated given the reduction in the overall square footage of the deck and the reduction in runoff, he would <br />not be opposed to the bump -out. <br />White commented there are other problems with this property and requested the applicant clean rip the <br />materials between his property and the neighbors as soon as possible as part of this application. <br />Dampier stated he would clean it up. <br />White inquired how long it would take to complete the construction. <br />Dampier stated as soon as the excavator can dig out the area, he would start work on the project and that <br />he should have the front of the house completed by mid July at the latest. Dampier stated the exterior <br />should be completed by the fall. <br />Murphy requested the project be completed by Labor Day. <br />Moorse stated since there is a concern regarding the clean -up, he would suggest that the council make the • <br />clean -up a condition of approval. Moorse inquired what action the City could take if the property is not <br />cleaned up. <br />Dampier stated the only area that is messy is the area that is directly affected by the construction and that <br />he would be willing to relocate the piles of materials if the neighbors complain about the mess. <br />Brenner stated it is the responsibility of the building official to make sure that the property gets cleaned up <br />and that she does not necessarily feel it needs to be a condition of approval in this motion. <br />City Attorney Poehler stated the issuance of the building permit could be conditioned upon the property <br />being cleaned up or requiring the applicant to provide the City with a cash escrow. <br />Dampier stated he would be willing to provide an escrow if the City requires it. <br />Murphy stated the clean -up should be completed by Memorial Day and the project on the outside should <br />be completed by Labor Day. Murphy noted the bump -out can only extend out 8.5 feet. <br />Gaffion stated there would be 23 inches allowed for the cantilever and then the bump -out at 8.5 feet, with <br />no deck extending beyond the bump -out. <br />Murphy moved, McMillan seconded, to direct Staff to draft an approval resolution for Application <br />#06 -3231, William S. Dampier, 3550 Ivy Place, with the condition the property is cleaned up by <br />Memorial Day and on the condition the exterior of the project is completed by Labor Day. <br />VOTE: Ayes 3, Nays 1, McMillan Opposed. . <br />PAGE 6 of 14 <br />