Laserfiche WebLink
r, �1 i <br /> PC Exhibit K <br /> Summary of Attached Preliminary Zoning Code Compliance Review <br /> Orono Business Park <br /> 1. This project proposes using the LR-1B portion of the site for office purposes. This is not <br /> provided for in the zoning code and Sta.te statutes do not allow the City to grant a use <br /> variance. The can not proceed for without rezorung to B-4 of the LR-1B portion of the <br /> property or a change in the LR-1B zoning district allowing LR-1B property to be used as <br /> proposed. <br /> 2. The project proposes buildings made up of three units separated by party walls. The <br /> zoning code defines each unit as a building and allows only one principal building per <br /> lot. Modification of the definition of building or a change in the code provision allowing <br /> only one principal structure per lot would be required. <br /> 3. The project proposes to satisfy some of the code requirements not on the lot on which <br /> the building is situated. The zoning code allows only parking to be provided on a <br /> different lot. <br /> 4. There are setback deficiencies. Setbacks are defined by property line,not the building. <br /> The front of setback is measured from the street lot line. The rear setback is measured <br /> from the reax lot line (the lot line opposite the street). <br /> 1 of 7 <br />