Laserfiche WebLink
� <br /> � <br /> #07-3274 • <br /> March 16,2007. <br /> Page 4 <br /> Lot Layout and Lot Standards <br /> Both resulting lots meet the 2-acre, 200' width standard of the LR-lA zoning district as <br /> � proposed. If the private road outlot is increased in width to accommodate a wider paved road, lot <br /> � lines may have to be shifted to keep 2.00 acres within Lot 1. <br /> Each lot is served by municipal sewer, hence preservation of septic sites is not a factor in site <br /> planning. Each lot has substantial area meeting the required frontlrear/side setbacks for <br /> construction of a new residence. It is likely that the existing non-conforming (<75' to lake) <br /> residence structure on Lot 1 will be replaced with a substantial new residence. The home at 1500 <br /> is also nonconforming due to lake proximity; while its replacement is not a foregone conclusion, <br /> it is likely. Both lots can be developed without the need for setback or hardcover variances. <br /> However, the applicant has requested special hardcover considerations for Lot 2. First, that the <br /> Woods cabin on the east shore of Lot 2 be allowed to remain (1,122 s.f. of hardcover to <br /> remaining the 0-75' zone); and second, that a hardcover alloiment of 17,500 s.f. or about 31% of <br /> - the 75-250' zone, be granted as part of the subdivision approval. Applicant notes this is <br /> substa.ntially less hardcover than currently exists on the property. <br /> Due to the unique layout, both lots would technically need an average lakeshore setback <br /> variance. This should be granted on a permanent basis for both lots as part of the subdivision <br /> approval, subject to meeting all setback requirements. � . <br /> Park Dedication <br /> The City has no proposed trails on Bracketts Point, and no proposed or anticipated park needs. <br /> Since this is functionally a lot line rearrangement of existing developed lots and no new building <br /> sites=a.�e=b.eing create.d,eno pa�kland detlicatiQn�or fee�sxequired. <br /> Utilities <br /> As part of this formal road and easement vacation application, the appropriate public utility <br /> companies will be notified to determine�whether their facilities are impacted and the need for <br /> retention or creation of easenients. This item will not be brought forward to Council until the <br /> utilities have had a chance to respond. <br /> City sewer exists in a portion of the right-of-way to be vacated. This will become the lakeshore <br /> yard of a new residence on Lot 1. The applicant proposes to install new sewer lines under the <br /> � new private road, to serve a11 three abutting properties. The existing sewer lines will then be <br /> abandoned. This relocation will also provide a direct connection for the Headrick property rather <br /> than traversing other properties. The new sewer lines will be owned by the City. <br />