My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-2007 Planning Commission Packet
Orono
>
Planning Commission
>
2007
>
02-20-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 4:09:29 PM
Creation date
6/19/2012 4:09:12 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#07-3250 <br /> • • J:►nu�ry 11,2007 <br /> , . , Pagc 6 of 12 <br /> . for these builclings will be as much as 5' velow the crest of the liill iii sozlie locations aloiig tlie <br /> � rear of t11e property, helping to lower their visu�.l iiupact as viewed fi�oni the iioi-th. Due to the <br /> � northeasterly slope, tl�e northeast racade of Builciiiig 5-6 will Ue fairly visible:froni the nortlleast, <br /> altliough some beruling is �Iso proposed ii� the iiortheasi corner of tlie site as screeiuiig which <br /> will niask nntch o�'the walkotli:level fa��de. ' <br /> � Buildings 7-8 and 9-10 will have their walkout facades facing 11ie Seiuor Housing site to the east. . <br /> Tlus will be accoiiiplished by sonle fairly cieep cuts into the easi; faculg sicleslope aloiig the east <br /> lot liiie. A low Uerni will be left along tlle east Iot line that will provide soilie screeiling of the <br /> lower fagade of Build'uig 7-8 as viewecl from tlie east, le�.ving flie waikout far�ade of Building 9-� <br /> 10 relatively visible. . _ <br /> . In order to nleet parking lot aiid driviiig laiie grade linlits, and to acconlinodate filie proposed <br /> wallcouts,the site will be undergoing fairly substantial overall grade reductioils. The high ground <br /> � in the south half of the property will be lowered approxinlately 4'-8' oii average, wlule the <br /> walkout corridor along tlle north and east lot lines resttlt in cuts averagi.ng 10'-15' or more. <br /> The parlculg area nortli of the weld'ulg sliop buildiilg will reniain elevated about �-6' above the <br /> adjacent welding shop site, requiring an east-west retauung wall ranging in height froizi 3' to 6'. � � <br /> . Tlus wall will coiitinue uoifih and south along the westerly botlnclaries of the sife, at heights from <br /> 1' to 4'. � <br /> Tqpography is aii u�liereiit challenge to developmeiit of tlus site, sulce significant reinoval of <br /> earth�material is required to nzake it suitable in terizls of site access, fiuictioiiaiity of parking areas <br /> aud building design, aud compatibility with surrounding development. � <br /> Lot Area/Width and Setback Requirements � <br /> B—6 Re uired Existin � � � <br /> Lot Area 2 acres � 2.64 acres � <br /> � Lot Width 100' 190' . � . . . <br /> Buildin Setbacks Re uired • Pro osed . <br /> Front � 30' 91' (Blda. 9-10) � . � .�' <br /> � Rear ad'aceiit to R dist�ict) 35' 35' (Bld .3-4) <br /> . � E. Side (ad'acent to R district) 35' � 35' (Bld . 7-8) � . <br /> � W. Side(ad'acezit to B clistrict) 10' 83' (Bldg. 9-10) <br /> Parkin Setbacks Re uirec] Pz•o osed � <br /> Front � I S' 3 5' <br /> Rear � 10' 20� ' � <br /> 20' at NW end backu a ron <br /> Side (east) 10' " 105' <br /> Side (west) 5' S' . <br />
The URL can be used to link to this page
Your browser does not support the video tag.