Laserfiche WebLink
- , Page 7 13 November 2006 <br /> Y 7. Construction entrances should be indicated on each lot entrance, upon <br /> � completion of bituminous activities. <br /> �` Lot construction entrances have been added to the plans, see sheet C3.2. <br /> 8. Copies of all approved wetland impacts and approved restoration plans <br /> should be copied to the City, and provided within 7 days of commencing <br /> construction activity. � <br /> � Copies of all approvals will be forwarded to the City at/east seven days prior <br /> to the star�of construction. � <br /> Please contact Steve Johnston or me if you should have any questions regarding our <br /> revisions. <br /> � Sincerely, • � <br /> LANDFORM* <br /> �L---�-�-,�1�-� Ca�` . . � �. <br /> Christopher N. Call, Senior Designer � � <br /> cnc � <br /> COPY: File � <br /> ENCL: Geotechnical Report prepared by Braun Intertec Corp., dated 27 October 2004 <br /> Revised Plans: 3-ful(size, 1-11x17 . ' <br /> *Landform Engineering Company doing.buslness as Landform <br /> 900 NORTH SIXTH STREET SUITE SOOC MINNEAPOLIS,MN 55403 <br /> OFFICE: 612.252.9070 FAX:612.252.9077 www.landform.net <br />