Laserfiche WebLink
. IVII.IVIII�G VGIIIVII <br /> Page 6 13 November 2006 <br /> Jennifer Hiidebrand Memo of 18 August 2006 <br /> 1. Language sh.ould be added to provide the City with a completed SWPPP - <br /> and NOI a minimum of 7 days prior to. commencing construction. Also, <br /> identification should be clear within that document who will be responsible for <br /> inspections and maintenance during the life of the project. � <br /> SWPPP notes will be added to the �nal plans. <br /> 2. Clarification of inetal or wood silt fence posts should be made on detail, as <br /> provided. � <br /> The silt fence detail has been revised, see sheet C3.4. � . <br /> 3. Locations should be indicated on the plan as to where stockpiles of organic . <br /> materials will be located during construction and what protective measure will <br /> be conducted during their periods of inactivity. <br /> A stockpile location and protective measures have been added to the plans, <br /> see sheet C3.2, SWPPP notes will be added to the final plans. <br /> . � <br /> 4. Clarification should be made to include the intention to follow all local, county, � <br /> watershed, and state regulations with respect to stormwater compliance <br /> issues. <br /> A note has been added to the plans, see sheets C3.2. <br /> 5. Impervious surface changes should be provided to the city, may be provided <br /> along with the completed SWPPP. <br /> An impervious surfaces summary has been added to the plans, see sheet C2.9. <br /> The SWPPP will be completed for the final plans. <br /> 6. Inlet protection will be changed upon completion of bituminous or paving � <br /> activities, please provide detail to support this practice, and indicate on <br /> erosion control plan. -� <br /> � � � � �An inlet protection detail for paved areas has been provided, see sheet C3.4. <br /> ` 100 NORTH SIXTH STREET SUITE 800C MINNEAPOLIS,MN 55403 <br /> OFFICE: 612.252.9070 FAX:612.252.9077 wvrw.landform.net <br />