My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-2006 Planning Commission Packet
Orono
>
Planning Commission
>
2006
>
11-20-2006 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:46:52 PM
Creation date
6/13/2012 2:25:36 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr.Mike Gaffron Re:Orono Villas <br /> , Page 4 13 November 2006 <br /> r <br /> • Plans should be submitted to the Fire Marshal for review and approvaL ~ <br /> Plans will be submitted to the Fire Marshal for review and approval. � <br /> Easements � <br /> • It appears that the proposed sidewalk to the east of the townhouse on Lot 2 <br /> encroaches on the proposed drainage and utility easement. The sidewalk <br /> should be relocated outside of the proposed easement. <br /> The sidewalk for the townhouse on Lot 2 has been revised to be outside of the <br /> proposed easement, see sheet C4.1. � <br /> • 10' drainage and utility easements should be provided along all exterior lot <br /> lines. In addition, drainage and utility easements should be provided along all <br /> ponding areas, drainage ways, and wetlands. Specificalfy, an easement should <br /> be provided over the existing wetland in the southeast corner of the site, and <br /> �extend west along the south property line to the existing wetland. ln addition, a <br /> 20' drainage and utility easement should be provided over the proposed <br /> watermain along the north boundary of the site. . � <br /> A 90'drainage and utility easement has been provided along all exterior lot lines. All <br /> ponding areas, drainage ways and wetlands have been provided drainage and utility <br /> easements.. A 20'drainage and utility easement has been provided for the proposed <br /> watermain. See sheefs C4.1 and C5.� for all easements. � <br /> General � <br /> � . • The proposed improvements will disturb more than one acre. This will require a <br /> permit from the MPCA. Final pfans should include a detailed Storm Water � <br /> Pollution Prevention Plan (SWPPP) for review and approval. <br /> A detailed Storm Water Pollution Prevention Plan will be provided in the fina!plans <br /> for review and approval. . <br /> •. The plans should include all applicable Orono City Standard Details. <br /> The final plans will include all applicable Orono City Standard Details. <br /> • All submitted plans (half size and full size) should be scaleable. <br /> Okay � • <br /> • Once the plans have been completed we wifl prepare an estimated cost for the <br /> site improvements as a basis for the necessary financial guarantee. � <br /> 100 NORTH SIXTH STREET SUITE 800C MINNEAPOLIS,MN 55403 <br /> OFFICE: 612.252.9070 FAX:612.252.9077 www.landform.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.