My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-2006 Planning Commission Packet
Orono
>
Planning Commission
>
2006
>
11-20-2006 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:46:52 PM
Creation date
6/13/2012 2:25:36 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� ' <br /> �� Inter-4f�`ice M�mo <br /> To: TPK � Date: 8/18/2006 <br /> From: JLH <br /> Phone: *4770 <br /> Re: 06-3225 Orono Villas <br /> Remarks: <br /> Tom, . <br /> The following are my concerns regarding the Preliminary Erosion Control Plan, as submitted by Landform dated <br /> 07-19-06. Please fet me know if you have any questions. <br /> 1. Language should be added to provide the City with a completed SWPPP and NOI a minimum of 7 days <br /> prior to commencing construction. Also, identification should be clear within that document who will be <br /> responsible for inspections and maintenance during the life of the project. <br /> 2. Clarification of inetal or wood silt fence posts should be made on detail, as provided. <br /> 3. Locations should be indicated on the plan as to where stockpiles of organic materials will be located <br /> during construction and what protective measure will be conducted during their periods of inactivity. <br /> 4. Clarification should be made to include the intention to follow all local, county, watershed, and state <br /> regulations with respect to stormwater compliance issues. <br /> 5. Impervious surface changes should be provided to the city, may be provided along with the completed <br /> SWPPP. <br /> 6. Inlet protection will be changed upon completion of bituminous or paving activities, please provide detail <br /> to support this practice, and indicate on erosion control plan. <br /> 7. Construction entrances should be indicated on each lot entrance, upon completion of bituminous <br /> activities. <br /> 8. Copies of all approved wetland impacts and approved restoration plans should be copied to the City,. <br /> and provided within 7 days of commencing construction activity. <br /> Bonesfroo,Rosene,Anderlik and Associafes,Inc. www.bonestroo.com <br /> SL Paul: Milwaukee: Rochester. SL Cloud: Chlcago: <br /> 2335 Wesl Highv�ay�G 1?075 N.Cwporale Parkway,51e 200 112 7�Slreal NE 372129�Slree!S 1860 Wes!VJincheslef Rd,Sla 106 <br /> 51.PauL MI•I 55113 Mequon,4YI 53092 Rocheslar,Mh!55900 " SI.Cbud.FAPI SG701 I.�ertyvNe,!L 60D48 <br /> Phone:651•G76460D Phone:262•6-03•4092 Phone:507•282-2100 Phone:3Z0•251•d55� Phonn:847-81EtG71 <br /> Fax:65t•63G•1911 faz:262•2At�a901 Fax:507-2823100 FFax:320•251•5252 Fax:&f7•81fr9762 <br />
The URL can be used to link to this page
Your browser does not support the video tag.