My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-17-2006 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2006
>
07-17-2006 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 11:26:04 AM
Creation date
6/13/2012 11:25:10 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, , , . U <br /> lYXINUTES OF TAE <br /> ORONO PLANNING COlYIMISSION MEETING <br /> �k7t� �- . <br /> Monday,J'une 19, 2006 E..,����:-�L=�� - <br /> 6:00 o'clock p.m. <br /> (Recess taken at 7:29—7:33 p.m.) <br /> 8. #06-3208 RYAN COMPANlES US,INC., ON BEHALF OF VCI CAPITAL,SE CORNER <br /> OF WEST WAYZATA BOULEVARD AND OLD CRYSTAL BAY ROAD, CONDITIONAL <br /> USE PERMIT AND COMMERCIA.L SITE PLAN REVIEW,7:33- 8:48 P.M. <br /> Genevieu McJilton,Ryan Companies; Jeff Helpka,Ryan Companies; Steve St�vanke,R.LK; and <br /> � Jed Lockwood,RLK,were present. ' <br /> Tumer stated the applicants are requesting approval of a Class III subdivision of four industrial lots. <br /> Preliminary review of the site plan and conditional use permits for development of the lots is also <br /> requested. Turner indicated because this is a Class III subdivision,this initial review is functionally a <br /> sketch plan review. <br /> Rahn inquired whether the City Engineer has reviewed these plans. <br /> Turner stated the City Engineer had reviewed the initial plans and did provide some comments,which <br /> the applicant responded to. Tuzned stated the city engineer has not had an opportunity to respond to the <br /> applicants' latest revisions. <br /> McJilton stated they are looking for is approval to renovate the existing building,removal of the house, <br /> and to add three additional office/warehouse buildi�ngs. McJilton stated the phasing of the project�vould <br /> involve the removal of the small offtce building,which was originally a house, at the start of <br /> development, followed by construction of the office/�varehouse buildings and renovation of the larger <br /> building. McJilton stated it is their belief the project is consistent with the Orono's Comprehensive <br /> Plan. <br /> McJilton stated they have had limited time to review Staff's comments that they just received today. <br /> McJilton stated the first issue deals with the conditional use permit and that they are proposing building <br /> materials that�vould utilize the same features and colors,as the two smaller buildings. McJilton <br /> �'AGE 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.