Laserfiche WebLink
� r <br /> Clarlc Lohr Pebruary 6,2006 <br /> Generally, Level of Service "D" represents the threshold for acceptable ovec�ll intersection operating <br /> COl1C�ItI011S CILIPing a peak hour. <br /> The acceptable threshold for a particular n�oveinent at an intersection depends on both the priority <br /> assigned to that movement and its traffic volume. In genecll, the higher the priority and the higher the <br /> traffic volume,the more stringent the acceptable threshold will be. i'or example,the acceptable threshold <br /> for a high-priority/high-volume movement might ve "C," while LOS "P" on a low-priority/low-volume <br /> movement might be appropriate. Typic111y,LOS "D" is chosen as the threshold for peak hour operations <br /> on facilities throughout the metropolitan acea. <br /> For side-street-stop-cont►•olled intersections, a key measure of operational effectiveness is the side street <br /> LOS. Long delays and poor LOS can sometimes result on the side street, even if the overall intersection <br /> is fi�nctioning well. Again, de�ending on priority and traffic volume, lcceptable side-street LOS can <br /> ringe from "D"to"F,"with LOS"D"typical ly chosen as the threshold. <br /> A final fundamental component of operational analyses is a study of vehicular queuing, or the lineup of <br /> vehicles waiting to pass througll an intersection. An intersection can operate witl� an acceptable level of <br /> service, but if queues from the intersection extend back to block e��trances to turn lanes or accesses to <br /> adjacent land uses, unsafe operating conditions could result. The 95'�' percentile c�ueue, or the length of <br /> queue with a 5% chance of occurring during the peak houc, is considered the standard for design <br /> purposes. <br /> Onerational Analysis Results <br /> 2009 No-Build Conditions <br /> Table 2 provides the results for 2009 No-Build conditions. It is noted tl�at existing signal timing <br /> inforination for the intersection of Wayzata Boulevard and Old Crystal Bay Road, provided by MnDOT, <br /> was utilized in determining an appropriate timing plan for the analysis. It was assumed that Hennepin <br /> County will undertake the process of conducting traffic counts and retiming signals along Wayzata <br /> Boulevard once new TH 12 has opened to traffic and jurisdiction of Wayzata Boulevard is turned over. <br /> Table 2. <br /> Results of O erational Analysis—2009 No-Build <br /> Intersection Melsure of Effectiveness AM Pe�k Hour PM Peak Hour <br /> Wayzata Overall LOS C C <br /> .__.._................_...._._....._._.....__......_._.._.._....__......._......_.._�-------- —•--- - <br /> Boulevard&Old _Worst Movement LOS D S2 movements ____ _ D(2 movements) <br /> Crystal B1y Rd. � �� Lon est 95'�Percentile ueueV �� 394 feet eastbound) 450 feet(westbound <br /> Wayzata Overall LOS A � A <br /> -�.................-�-�--._....---_..................__..---........._....__.......___._._-------- --.__.___._----__. -- <br /> Boulevard&Site Northbound LOS C C <br /> .�._..............._.......�...__�.._.......�_.........................._._.._._._.__.__�. __._. <br /> Access ._Nortlibound 95`"Percentile Queue, _ _____less tlian one vehicle _� _____�less tltan one vehicle <br /> 1Vlainline Dela %Vel�icle 0.0 sec%veli EB),0.1 sec%veh WB) 0.0 sec%veli CB&W.B) <br /> Old Ciystll Bay ... ... ... ....Ovei.all LOS........... ... A A <br /> ..--.--------__.....---.___..--.--.--.___.__.�..____._.._._.__._.._._...._----._.. _�._._. <br /> Rd.&South Site Eastbound/Westbound LOS C/13 B/B <br /> . .. . .... _._..__........._.... ... ---�--•-----�--.__._.___.__-------._.__._...______.._— -- <br /> Access Lon est 95'h Percentile Queue less than one vel�icle less than one vehicle <br /> Results of the o�erational analysis of 2009 No-Btiild conditions show acceptable overall intersection <br /> levels of service at all four studied intersections. On an II1dIVICIUI� movement basis, all movemenYs <br /> operated at LOS ".D" or better. Q«euing will reinain an issue o» Wayzata Boulevard during peak times, <br /> RLK Inc. Page 5 of7 Orono OPfice/Warehouse <br /> � G:1Rym�Companies12006-021-M1 Technieol Dnln\Imllic4c{wn102-10-OG upclnled sq fooinges\TIS menw 0?-I O.OG.doe 260G-02 I-M <br />