My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-17-2006 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2006
>
07-17-2006 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 11:26:04 AM
Creation date
6/13/2012 11:25:10 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> , � <br /> Clark Lolir February 6,2006 <br /> with 95'�'peccentile queues extei�ding 394 feet during tlie AM peak(eastbound tclf.fic)and 450 feet during <br /> the PM peak(westbound traffic). <br /> 2009 Build Conclitions <br /> Table 3 pcovides the i•esults for 2009 Build conditions. <br /> T�ble 3. <br /> Results of O erationll An�lysis—2009 Build <br /> Intersection Me�sure of Effectiveness ' AIVI Pe�k Hour PM Pe�►k Hour <br /> Wayzata Overall LOS C C <br /> __....._.........................._...__..__._...._.._.._....._.._.......__��_ _��._._..______.�._.._.------ -- - ----- <br /> Boulevard&Old Worst Movement LOS ...__ __ D(4 move►nents�__._....__._..__.__�_�D(2 movements) _ <br /> --•......................._..- ---.._._..____..__... <br /> Crystal Bay Rd. Lon est 95�'Percentile ueue 467 feet eastbound) 450 feet westbound <br /> Wayzata Overall LOS A A <br /> _...._..._........�..._._.........-----....._._............._.._........_.___.—_.._._._._.__._.__.__....__.---�----�----�---._.. _�._.� --- <br /> Boulevacd&Site Northbound LOS C B <br /> ........._...._...._......._._..__. ....__...._............ ------•---_.__._.�.__.__.----------- �._._ �. <br /> Northbound 95`�'Percentile�ueue (ess than one vehic(e less th�n one vehicle <br /> Access ...._......_......__......_...._...---�-��----�--..._................._._......-----_______._..._.---__._-- ---_ — <br /> Mainline Dela /Vehicle 0.0 sec/veh(EB&W.B 0.0 sec/veh EB&WB <br /> Old Crystal Bay ._.,, .. Overall LOS, .^ A A <br /> . . .........__... .._.-�-�---....._._..____..--�-�------�---_._...__.._._ —. _ <br /> Rd.&No�th Site Westbound LOS B B <br /> ................�......__._._...__._._.._......_..............._......_....---..__._w_.-�----�---____...--•----.—_----_--____._.�.-----�-- <br /> Access Westbound 95'�'Percentile ueue less than one vehicle less than one vehicle <br /> Old Crystal Bay Overall LOS A A <br /> .......................... ........ ........................ .._._.__......____...___....__......__._........._,___---.._...___._.__....__.�.._.__�_ ._.__.y.__._. <br /> Rd.&South Site Eastbound/Westbound LOS C/B B/B <br /> ...._...................._....................................._.........__ -----------�---�--•-------------------�----— � <br /> Access Lon est 95°i Percentile ueue less than one vehicle less than one vehicle <br /> Two important changes occur under the Build scenario. The first is the limiting of the Site Access on <br /> Wayzata Boulevard to right-in/right-out only. Review of tI�e results of the analyses conducted shows that <br /> this limitation will positively impact operations by slightly lessening the PM peak hour westbound c�ueue <br /> at the Wayzata Boulevard/Old Crystal Bay Road intersection and im�roving the northbound LOS at the <br /> Wayzata Boulevard/Site Access intersection fi•om LOS C to B in the PM peak hour. The second change <br /> is the creation of the Old Crystal Bay Road/Noi�th Site Access intersection. Results indicate tliis <br /> � intersection will operate at acceptable levels of service and without adverse queuing issues. <br /> Beyond these two changes, operations for Build conditions are largely similar to those under No-Build <br /> conditions. The differences include two additional move�nents operating at LOS D for the AM peak hour <br /> (the eastUound and tlorthbound through movements; at LOS C for No-Build), and the lengthening of tlle <br /> eastbound AM peak hour 95`�'percentile queue to 467 feet from 394 feet. <br /> Review of Cr�sh D�ta <br /> In order to ensure tl�at addition of site-generated tcaffic would not exacerbate an existing safety problem <br /> at the Wayzata Boulevard site access intersection, crash data for the most recent 4-year period was <br /> requested fi•om MnDOT. Review of the crash data reveals that four ci�ashes occurred within the 4-year <br /> period within 400 feet of the site access. Of ihe foui•craslles, one was a car-deer collision and three were <br /> rear-end collisions. The direction of travel was westbound in 111 four c�ses. The tcaffic signal to the west, <br /> along witl�driver inattention and glare were cited as contributing factors. <br /> Since none of the repocted accidenfis are of the type correctaUle by conversion to right-in/right-out only <br /> access (such as a cight-angle collision), the limitation of the access to right-ii�h•ight-out only movements <br /> does nof appear to be necessaty on the blsis of safety. I-Iowever, as 1 proactive measure to mitigate the <br /> addition of site-generated traffic, such closures have been shown to be Ueneficial ii� similar situations <br /> elsewl�ere. <br /> RLK lnc. Page G of7 Orono Offiee/Warehouse <br /> G:Utyan Compmics�200G-021-M\Tcclmicnl Dnln\Irnflic4c�wn102•10-W iry�dnled sq foaiagcs\TIS mcmo 02-10•OG.doe 200G-021-M <br />
The URL can be used to link to this page
Your browser does not support the video tag.