My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-21-2006 Planning Commission Packet
Orono
>
Planning Commission
>
2006
>
02-21-2006 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 9:55:39 AM
Creation date
6/13/2012 9:55:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
` � <br /> February 1, 2006 � <br /> Mr. Mike Gaffron <br /> City of Ol'Ori0 Planning <br /> 2750 Kelley Parkway • ' � <br /> Crystal Bay,NII�i 55323 Civil Engineering <br /> Land Surveying <br /> Re: Sheri1 La1ceVleW EStates l.andscape Architecture <br /> Dear Mr. Gaffron: ' Environmental <br /> This letter is written as a follow-up to the staff ineeting held at your offices on <br /> January 24`�' and Engineer's memo dated January 17, 2006 and is intended to <br /> confirm the points discussed at the meeting for preliminary plat approval. The <br /> attached plans have been revised to address points below. � <br /> 1. The proposed retaining wall will consist of dark color earth tone <br /> (brown) block. We have supplied a construction detail of the retaining � <br /> wall, and we have also included a barrier at the Lot 4 driveway <br /> hammer-head as requested by the City Engineer. Since there are <br /> significant over-story maple trees that we wish to preserve to the <br /> greatest extent�ossible, we are proposing an ivy planting variety that <br /> does well in the shade to satisfy screening concerns of the retaining . <br /> wall. We have also included photos and an air photo to show that the � . � � <br /> existing mature trees will also significantly help in screening the � • � � � � � <br /> majority of the wall from various view-sheds of the property. . � <br /> 2. City Engineer confirmed proposed driveway grades shown on the � _ � _ � � .� <br /> proposed plans were acceptable. . � <br /> 3. Storm sewer pipe on north side has been placed under drainage and <br /> utility easement. Rainwater gardens and swales will either be placed <br /> under easements or maintenance agreements within the covenants at � <br /> the time of Final Plat as discussed. <br /> 4. Water and sewer service connections to Lot 4 were adjusted to address . � <br /> City Engineer's comment. . <br /> 5. Detail sheets were replaced with applicable City standard detail plates � ' �� � <br /> received from the City Engineer. . � � � . <br /> 6. Minor changes to the proposed grades on the northwest vegetative � - � <br /> swale have been made. � . � � <br /> 7. Grading plan confirmed to be acceptable by City Engineer. � <br /> Please call me as soon as possible if you have any questions, or if you believe we , � <br /> are missing anything that would hold up the process. <br /> Sincerely, � � ' • <br /> LOUCKS ASSOCIATES � ' � <br /> �����' �SO�IAT'E� <br /> Jared D. Andrews, AICP <br /> Senior Planner <br /> CC: Loren Fritz <br />
The URL can be used to link to this page
Your browser does not support the video tag.