Laserfiche WebLink
Part II. DEPRESSURIZATION PROTECTION � � <br /> Check option used: ❑ Aggregate (complete aggregate worksheet on next page) ❑ Prescriptive(complete worksheet below) <br /> ❑ Perfonnance(submit test report prior to final inspection) ❑ No fuel burning equipment <br /> PRESCRIPTIVE PATH WORKSHEET <br /> INSTRUCTIONS COMBUSTION EQUIPMENT SCHEDULE Pernutted E ui ment <br /> check all es ro osed) Path 0 Path 1 Path 2 Path 3 <br /> Step 1. Complete the Combustion Space heating ❑ Sealed combustion Y Y Y Y <br /> Equipment Schedule on the right. ❑ Direct or ower vented N Y Y Y <br /> Step 2. Choose a Make-up Air Path with a ❑ Atmos hericall vented N N Y* Y <br /> Y(Yes) for all selected equipment. Water heating ❑ Sealed combustion Y . Y Y Y <br /> Step 3. Complete the table below for the ❑ Direct or ower vented N Y Y Y <br /> Make-up Air Path chosen, indicating ❑ Atmos hericall vented N N N Y <br /> flows in cfin for e�aust and make- Hearth —gas ❑ Sealed combustion Y Y Y Y <br /> Up air methods proposed. Only the ❑ Direct or ower vented N Y Y Y <br /> capacity of largest exhaust appliance ❑ Atmos hencall vented N N Y* N <br /> in each category need be considered. Hearth— solid ❑ Closed controlled N Y Y* N <br /> Step 4. Fill out the Pnssive Make-up Air fuel ❑ Decorative N N Y* N <br /> Opening Schede�le on the next page. *Only one atmos herically vented a liance may be installed in Prescriptive Path 2 <br /> ❑ Path 0 — Prescriptive Make-llp AlI' MetllOCl Exhaust Passive Passive Powered Make-u� <br /> Infiltration O enin <br /> Clothes dryer: Passive infiltration for up to 175 cfms <br /> Passive o enin s for cfms over 175 ' <br /> Kitchen eachaust: Passive infiltration for up to 250 cfm <br /> Passive openings for cfins over 250 <br /> Powered to match flow for cfins over 500 <br /> Other e}chaust:f . Passive openings for up to 140 cfm <br /> Powered to match flow for cfins over 140 N/A <br /> fi Need not include central vacuum exhaust in Path 0. TOTALS <br /> ❑ Path 1 — Prescriptive Make-up Air Method E�naust Passi�e Passive Powered Make-uF <br /> Infiltration O enin <br /> Clothes dryer:$ Passive infiltration for up to 175 cfin <br /> Passive o enin s for cfms over 175 <br /> Kitchen exhaust: Passive openings for up to 250 cfrn <br /> Powered to match flow for cfms over 250 N/A <br /> Other e�aust:$ Passive openings for up to 140 cfin <br /> Powered to match flow for c£ms over 140 N/A <br /> TOTALS <br /> � If closed controlled combustion solid-fuel burning appiiance is installed in Path l,then the clothes dryer and any central vacuum that <br /> e�austs to outside must be provided with make-up air by passive opening to match flow. Otherwise need not inciude central vacuum. <br /> ❑ Path 2 — Prescriptive Make-up Air Method E?�nauSt Passive passi�e Powered Make-uF <br /> Infiltration O enin <br /> Clothes dryer: Passive openings for up to 175 cfin <br /> Powered to match flow for cfms over 175 N/A <br /> Kitchen exhaust: Powered to match flow N/A N/A <br /> Other exhaust: Powered to match flow N/A N/A <br /> TOTALS N/A <br /> ❑ Path 3 — Prescriptive Make-up Air Method E�aust Passive Passive Powered Make-u� <br /> Infiltrarion O enin <br /> Clothes d er: Powered to match flow N/A N/A <br /> Kitchen e�aust: Powered to match flow N/A N/A <br /> Other exhaust: Powered to match flow N/A N/A <br /> TOTALS NiA N/A <br /> 14 <br />