Laserfiche WebLink
In my opinion, if the city had completed the ditch work in a timely fashion (beginning of July— <br /> after closing) there would be no sediment issue at all. Honestly, I've been waiting for the city to <br /> complete the ditch work and assumed we were on the schedule for the beginning of July based <br /> on our discussion, but obviously that hasn't happened. <br /> I can remove the logs and silt fence myself, but I believe that the city should do the rest of the <br /> ditch work, including cleanup of the channel area, as originally discussed and at no charge to <br /> me. <br /> Please let me kn;,�v vs,�he^ th;s v�orlc car be c�mp!eted this �veek. <br /> Thanks, <br /> Matt <br /> Matt Fritz <br /> Exec Consulting Inc. <br /> 612.802.6053 <br /> From: bub�iz�i�.bult�r�-niznk.��i�� <br /> To: khem�'cicornzrstoneccinc.com; �ICurtis�a�ci.orono.mn.us; Joe a�solidaroundhomes.corn; <br /> rlattfritz?1��hotmail.com <br /> CC: SOberai�,ner�a ci.orono.mn.us; permittin�J �i minnehahacreek.or�� <br /> Subject: RE: 4055 Elm St - erosion control fence <br /> Date: Thu, 7 Aug 2014 19:30:16 +0000 <br /> Kelly, <br /> Yes, please remove the siltfence and logs. The sediment adjacent to Elm Street can be graded <br /> into the right-of-way by the City when the catchbasins are lowered and erosion control blanket is <br /> installed. However, the sediment in the downstream channel (on the west side of the property) <br /> must be removed and the channel restored. Please let us know when this work will be completed <br /> so Scott can coordinate completion of the City's work. <br /> Thanks, <br /> Robert E. Bean, Jr, P.E. <br /> LEED Green Assoc. <br /> Bolton & Menk, Inc. <br /> P:(952) 448-8838, ext 2892 <br /> z <br />