My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
grading issues
Orono
>
Property Files
>
Street Address
>
E
>
Elm Street
>
4055 Elm Street - 06-117-23-41-0106
>
Correspondence
>
grading issues
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:28:14 PM
Creation date
7/19/2016 11:56:38 AM
Metadata
Fields
Template:
x Address Old
House Number
4055
Street Name
Elm
Street Type
Street
Address
4055 Elm St
Document Type
Correspondence
PIN
0611723410106
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � � <br /> ��I shall provide all traffic control and flagging required to protect the traveling public during <br /> cleanup operations. <br /> (4) <br /> Erosion off-site. If erosion breaches the perimeter of the site, the owner shall immediately <br /> develop a cleanup and restoration plan, obtain right-of-entry from the adjoining property <br /> owner and get appropriate approvals from all state, federal, and local agencies as <br /> necessa . Then im I m n h I n <br /> ry p e e t t e c eanup a d restoration plan within 48 hours of obtaining the <br /> adjoining property owner's permission and approval from any appropriate state, federal, and <br /> local agencies. <br /> (Ord. No. 55 3rd series, § 1, 4-13-2009; Ord. No. 69 3rd series, § 1, 4-12-2010) <br /> Sec. 79-10. Completion of work. <br /> Work will be considered complete when all exposed soil areas have undergone final stabilization, as <br /> defined in section 79-5, is constructed to finish grade, and is in conformance with all permit conditions of <br /> approval to the satisfaction of the city. The owner shall notify the city when the land disturbing operations are <br /> ready for final inspection. Final approval shall not be given until all work, including installation of all drainage <br /> facilities and their protective devices, and all erosion control measures, have been completed and final <br /> stabilization has occurred in accordance with this chapter. <br /> (Ord. No. 55 3rd series, § 1, 4-13-2009; Ord. No. 69 3rd series, § 1, 4-12-2010) <br /> Sec. 79-11. Emergency corrective action. <br /> In the event circumstances exist such that noncompliance poses an immediate danger to the public <br /> health, safety and welfare, as determined by the city, the city may take emergency corrective action to <br /> prevent any such danger. The city shall make a reasonable effort to contact and direct the owner to take any <br /> necessary action. Any costs incurred by the city in connection with any emergency action may be recovered <br /> from the owner's financial security. <br /> (Ord. No. 55 3rd series, § 1, 4-13-2009; Ord. No. 69 3rd series, § 1, 4-12-2010) <br /> Sec. 79-12. Penalties. <br /> When an owner fails to conform to any provision of this chapter, the city may take the following <br /> actions: <br /> (1) <br /> Issue a stop work order. <br /> (2) <br /> Withhold the scheduling of building inspections. <br /> (3) <br /> Withhold the issuance of a certificate of occupancy. <br /> (4) <br /> Revoke any permit issued by the city for the site in question. <br /> (5) <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.