My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
grading issues
Orono
>
Property Files
>
Street Address
>
E
>
Elm Street
>
4055 Elm Street - 06-117-23-41-0106
>
Correspondence
>
grading issues
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:28:14 PM
Creation date
7/19/2016 11:56:38 AM
Metadata
Fields
Template:
x Address Old
House Number
4055
Street Name
Elm
Street Type
Street
Address
4055 Elm St
Document Type
Correspondence
PIN
0611723410106
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . � r. <br /> jj�l (6) . <br /> Any soil or dirt storage piles containing more than ten cubic yards of matenal should not be <br /> located within 25 feet from a roadway or drainage channel. If remaining for more than 14 <br /> days, they shall be stabilized by mulching vegetative cover, tarps or other means and <br /> enclosed with down gradient perimeter sediment controls. Piles which will be in existence for <br /> less than 14 days shall be enclosed with perimeter sediment controls. <br /> ��) <br /> Pipe outlets must have energy dissipation installed within 24 hours of connection to waters of <br /> the state. <br /> (9) <br /> Inspections and maintenance. The owner shall be responsible for conducting inspections and <br /> maintenance of all erosion and sediment control BMPs on site. <br /> (1) <br /> Inspections, maintenance, and rainfall on site must be documented and readily available for <br /> review. Inspections are required as followed: <br /> a. <br /> Once every seven days on exposed soil areas. <br /> b. <br /> Within 24 hours after a one-half inch or greater rain event over 24 hours. <br /> c. <br /> Once every 30 days on stabilized areas. <br /> d. <br /> As soon as runoff occurs or prior to resuming construction on frozen ground. <br /> �2) <br /> Maintenance is required as follows: <br /> a. <br /> When sediment reaches 1/3 the height of the BMP on perimeter control devices, <br /> sediment must be removed within 24 hours of discovery. <br /> b. <br /> If the perimeter control device is not functional it must be repaired or replaced within <br /> 24 hours of discovery. <br /> c. <br /> Temporary sediment basins shall be maintained when sediment reaches '/z the outlet <br /> height or '/z the basin storage volume. Basins must be drained or sediment removed <br /> within 72 hours of discovery. <br /> d. <br /> Sediment must be removed from paved surfaces within 24 hours of discovery. <br /> (3) <br /> Erosion into streets, wetlands or water bodies. If eroded soils (including tracked soils from <br /> construction activities) enter or appear likely to enter streets, wetlands, or other water bodies, <br /> prevention strategies, cleanup and repair must be immediate with the appropriate approvals <br /> from the DNR, MPCA, or any other state, federal, or local agencies as necessary. The owner <br /> 13 <br /> i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.