My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009444 - addition
Orono
>
Property Files
>
Street Address
>
E
>
Edgewood Hills Road
>
1045 Edgewood Hills Road - 02-117-23-41-0003
>
Permits/Inspections
>
1997-009444 - addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:10:19 PM
Creation date
7/14/2016 12:30:13 PM
Metadata
Fields
Template:
x Address Old
House Number
1045
Street Name
Edgewood Hills
Street Type
Road
Address
1045 Edgewood Hills Rd
Document Type
Permits/Inspections
PIN
0211723410003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 Contractor shall supply all labor, transportation, material, apparatus, <br /> scaffolding and tools necessary for the entire and proper completion of the <br /> work. He shall install, maintain and remove all equipment needed for the <br /> proper execution of this contract, and be responsible for the safe, proper and <br /> lawful performance of his men and equipment, maintenance, and use of the <br /> same. <br /> 1.3 All work, equipment, devices and processes shall comply with applicable <br /> building and construction codes, regulatory measures of any supervisory or <br /> regulatory govermental agency and all work, equipment and materials used <br /> shall in addition conform with requirements of latest edition of all <br /> construction standards as applicable or as incorporated by reference. All work <br /> shall be performed in strict accordance with manufacturer's/supplier's <br /> recommended standards and practices and the qualifiy of workmanship shall <br /> be in keeping with highest standards of the industry. These high quality <br /> industry standards shall govern performance and execution work in all <br /> sections. <br /> 1.4 The Contractor shall provide and pay for all labor, materials, permits <br /> (including building permit), licenses, taxes, equipment, tools, water, heat, <br /> utilities, transportation & other facilities & services as necessary for the <br /> proper execution & completion of work. <br /> 1.5 The Contractor shall deliver all work free from any and all mechanics liens, <br /> claims or encumbrances of any description for all labor, equipment, materials <br /> and other items, and shall furnish satisfactory receipts or lien waivers. <br /> Contractor shall agree to indemnify and hold and protect the Owner and the <br /> premises harmless from any liability or expense by reason of any filed lien or <br /> claim. Refer to Article 9, paragraph 9.12. <br /> 1.6 The Contractor shall warrant and guarantee all materials and workmanship <br /> no less than a period of 12 months from Owner's acceptance of the entire <br /> construction as evidenced by an acceptance certificate; except where <br /> manufacturer's warranty and guarantee exceeds this time period, then <br /> Contractor's time length shall be the same. <br /> 1.7 The Owner will furnish construction financing for the project. The <br /> Contracor shall negotiate with Owner for the percent of retainage for <br /> Contractor labor and material costs on monthly billings. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.