Laserfiche WebLink
' ST0 f�I-� Stork Twin City Testing Corporation <br /> Materials Technology <br /> Proposed Addition at Residence 965 Edgewood Hills Road Page 2 of 9 <br /> Orono, Minnesota <br /> Stork Twin City Testing Corporation Project #3106831 <br /> b. A site plan showing the approximate boring locations. <br /> c. Written description of encountered soil and groundwater conditions. <br /> d. A discussion as to the suitability of the soils encountered by our borings to <br /> support the proposed addition. <br /> The scope of our work is intended for geotechnical purposes only. This scope is not <br /> intended to explore for the presence or extent of environmental contamination at the <br /> site. <br /> 2.0 FIELD TESTING PROGRAM <br /> 2.1 Soil Borings <br /> A total of four (4) soil test borings were drilled on the site on July 8, 2009. The <br /> approximate boring locations are shown on the attached site plan. The planned <br /> locations and number of test borings was determined through discussions between <br /> James L. Patsch Construction and Stork Twin City Testing. Our drill crew elevated the <br /> borings using elevations shown on the lot survey. <br /> The standard penetration borings were performed with an all terrain mounted rotary drill <br /> rig using split-barrel sampling procedures. Water level observations were made in the <br /> boreholes during and upon completion of the drilling and sampling operations. During <br /> the field operations, the drill crew maintained logs of the subsurface conditions including <br /> changes in stratigraphy and the observed groundwater levels. The boring logs are <br /> attached. <br /> After completion of the drilling operations, the boreholes were backfilled with auger <br /> cuttings and bentonite chips to the existing surface. <br /> This agreement shall be governed exclusively by the general terms and conditions of sale and performance of testing services by Stork Twin City <br /> Testing,Inc.a North Carolina business corporation("TCT")dd.02/04/2001. In no event shall Stork Twin City Testing,Inc.be liable for any <br /> consequential,special or indirect loss or any damages above the cost of the work. Payment is due within 30 days of invoice. <br />